Pierce County, WA Building Safety: Building Inspections (2026)
Key Facts
- Enforcing agency
- Pierce County Planning and Public Works
- Final inspection gate
- Requires PCC 17A.10.090 construction approval first
- 2026 reinspection fee
- $126.50 per Table 17C.10-1-G
- 2027 reinspection fee
- $139.00 per Table 17C.10-1-G
- Maintenance covenant
- Recorded with County Auditor before sign-off
- Address posting
- Required under PCC 17C.20.150 before final inspection
Summary
Pierce County will not sign off on a final occupancy or final building inspection for any residential, commercial, or industrial structure until the site's stormwater and drainage work clears final construction approval under PCC 17A.10.090. That approval itself requires a completed County Inspector punchlist, an engineer's inspection report, record drawings, and a posted maintenance guarantee. A rejected inspection can also trigger a reinspection fee.
Final occupancy and/or final inspection approval of residential, commercial, and industrial structures will not be granted until such time that final site development construction approval is achieved in accordance with PCC 17A.10.090.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-515, and legislation passed through May 26, 2026).
Full Breakdown
090. That construction-completion approval is itself a checklist. 090 requires the County Inspector's final punchlist to be fully cleared, the project engineer to submit a completed Engineer's Inspection Report Form, the engineer to prepare and submit record drawings for County review, the applicant to post a Defect and Maintenance Financial Guarantee, an application for a Performance Monitoring Permit to be on file, a Maintenance Covenant approved, executed, and recorded with the Pierce County Auditor, permanent stabilization of the site soils, and any required easements and deeds approved, executed, and recorded.
Only after every item on that list clears does the Building Division schedule the final structure inspection. 150 before that final inspection happens. 090 lets the County charge a reinspection fee instead of returning for free; the code specifically exempts a first-time rejection from the fee, targeting only repeat or unready calls. 00 in 2027. 010, not just building inspections, so plumbing, mechanical, and fire inspections carry the same repeat-visit charge.
Violations & Fines
Calling for a final building inspection before PCC 17A.10.090's punchlist, engineer's report, and financial guarantees are on file just gets the request rejected: Planning and Public Works will not dispatch an inspector until site development construction approval is achieved. Requesting an inspection before the work is ready, or before ordered corrections are made, triggers the PCC 17C.10.090 reinspection fee, $126.50 in 2026 and $139.00 in 2027, rather than a free repeat visit.
Frequently Asked Questions
What has to happen before Pierce County will do a final building inspection?
How much does a Pierce County reinspection cost?
Does a Pierce County inspector charge a fee the first time work fails inspection?
Does Pierce County require anything on the property before the final building inspection?
Sources & Official References
Other rules in Pierce County
Compare Pierce County to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.