Key Facts

Special inspection
Building Official may order one anytime
Final inspection
Requires SEPA, fire district, other sign-offs
Certificate of Occupancy
Must be posted; only Official removes it
Pre-certificate use
Barred by amended IBC Section 111.1
Stop work order
Issued for unsafe or noncompliant work
Unlawful continuance penalty
Same as any code violation, up to $1,000

Summary

Lakewood's amended building code lets the Building Official call for a special inspection whenever needed to prove code compliance, ties the final inspection to sign-off from outside reviewers such as SEPA and the local fire district, and requires a posted Certificate of Occupancy before any building can be used.

H. Section 110.3.10.1, Special Inspection, add a new section to read as follows:Building official may require a special inspection for a particular item or system that when necessary to show conformance with the codes. I. Section 110.3.12, Final Inspection, is amended to read as follows:The final inspection is to be made after all conditions of SEPA, Hearings Examiner, Design Review, Development Engineering, Stormwater, Tree Ordinance, West Pierce Fire and Rescue district, outside agencies are complied with, in addition to finish grading; and the building is completed and ready for occupancy. ... ... K. Section 111.2, Certificate issued, is amended to read:After the building inspector inspects the building or structure and finds that it is in compliance with the applicable codes and regulations, the building official shall cause to be issued a Certificate of Occupancy on a form developed by the City to display the information pertinent to identify the facility and code requirements.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 852, passed June 15, 2026).

Full Breakdown

1 to the adopted IBC, the Building Official may require a special inspection for a particular item or system whenever necessary to show conformance with the codes; this sits alongside the routine framing, mechanical and other scheduled inspections. 060(I)), cannot be signed off until every outside condition is cleared: SEPA environmental review, the Hearings Examiner, Design Review, Development Engineering, Stormwater, the Tree Ordinance and West Pierce Fire and Rescue district approval must all be satisfied, in addition to finish grading, before the building is treated as complete and ready for occupancy.

060(K) requires the Building Official to issue a Certificate of Occupancy on a city-developed form identifying the facility and the code requirements it met; the certificate must be posted in an obvious place on the premises and cannot be removed by anyone except the Building Official. 060(J)) bars any use, occupancy, or change of occupancy of a building until the certificate has been issued, and makes clear that a certificate never authorizes a violation of the code or of other city ordinances. 060(N)), which the owner may appeal through the Section 113 hearing examiner process.

Violations & Fines

Continuing work after a stop work order has been served, other than work directed to remove the violation or unsafe condition, exposes the responsible person to the same penalties as any other Lakewood Building Code violation under amended Section 115.4 (LMC 15.05.060(O)): a misdemeanor punishable by up to 90 days in jail, a fine of up to $1,000, or both, per LMC 15.05.060(M).

Frequently Asked Questions

What triggers a special inspection in Lakewood?
LMC 15.05.060(H) adds Section 110.3.10.1 to the adopted IBC, letting the Building Official require a special inspection for any particular item or system whenever necessary to show conformance with the codes. It is a discretionary, added check on top of the routine inspection schedule.
What has to happen before Lakewood signs off on a final building inspection?
Under amended Section 110.3.12, the final inspection cannot be completed until conditions from SEPA, the Hearings Examiner, Design Review, Development Engineering, Stormwater review, the Tree Ordinance and West Pierce Fire and Rescue are all satisfied, along with finish grading, and the building is ready for occupancy.
Can I occupy a new building in Lakewood before the Certificate of Occupancy is issued?
No. Amended Section 111.1 bars any use or occupancy, or change of occupancy, until the Building Official issues a Certificate of Occupancy. Once issued under Section 111.2, the certificate must be posted in an obvious place on the premises and only the Building Official may remove it.

Sources & Official References

Other rules in Lakewood

All Lakewood rules

Compare Lakewood to another location·View the Washington building safety overview

Get notified when Building Inspections in Lakewood, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Nearby Cities

How other cities in this county handle building inspections.

Tacoma, WA
Some Restrictions