- Inspecting agency
- Department of Building Inspection, Sec. 5-3
- Mandatory checkpoint
- Foundation drain inspection before decking, Sec. 5-124(4)
- Drain pipe spec
- Perforated, minimum 4-inch diameter
- Stone bedding
- 2 inches #5/#57 VDOT stone, 6-inch cover
- First-offense fine
- Up to $2,500, Sec. 5-2
Summary
The county's department of building inspection, created under Sec. 5-3 and run by the building official, inspects construction for code compliance, and Sec. 5-124 sets a mandatory foundation drain inspection stage for one- and two-family dwellings: no further inspections or permits proceed until it passes.
The department of building inspection is hereby created and the executive official in charge thereof shall be known as the building official. ... Inspection of the foundation drain system shall be made prior to any plates or decking of any nature being placed on the foundation. The finished outside grade shall be established and marked on the foundation wall at this time. No additional inspections will be made by the department of building inspection, and no permits shall be issued until such time as the foundation drain inspection has been completed and approved.
Full Breakdown
Sec. 5-3 creates the department of building inspection and names its head the building official, appointed by the board of supervisors on the county administrator's recommendation for an indefinite term, removable at the board's pleasure with the administrator's concurrence. The building official enforces the adopted Virginia Uniform Statewide Building Code and the county's construction ordinances, issuing permits and conducting the inspections those permits require. For one- and two-family dwellings specifically, Article IV's Sec. 5-124 layers on additional inspection requirements tied to drainage. Lots must be graded to drain surface water away from foundation walls, and foundation drains must be installed around any enclosed habitable or usable space below grade that is subject to ground water, discharging by gravity or mechanical means into an approved drainage system.
The drain tile or pipe must be perforated, at least four inches in diameter, bedded on two inches of #5 or #57 VDOT-specification stone, and covered with at least six inches of the same stone. Critically, Sec. 5-124(4) makes the foundation drain inspection a hard checkpoint: it must occur before any plates or decking are placed on the foundation, and the finished outside grade must be established and marked on the foundation wall at that same time. No additional inspections proceed, and no permits are issued, until the department of building inspection has completed and approved the foundation drain inspection.
Sec. 5-123 adds a related field check on utility placement, requiring meter barrels to be set with at least 36 inches of ground cover and water lines with 36 inches of cover except at the building foundation, with meters set 18 to 22 inches from the top of the barrel lid.
Violations & Fines
Building past the foundation drain inspection stage without approval, or otherwise violating Chapter 5's construction requirements, is a misdemeanor punishable by a fine up to $2,500 under Sec. 5-2, with escalating fines and up to ten days in jail for repeat offenses on the same property within ten years. Sec. 5-124(4) independently blocks further permits and inspections until the foundation drain inspection is completed and approved.
Frequently Asked Questions
What inspection stage can stop construction on a new house in Spotsylvania County?
Who runs building inspections in the county?
What are the foundation drain specifications the county checks?
Sources & Official References
Other rules in Spotsylvania County
Compare Spotsylvania County to another location·View the Virginia building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.