Richland County, SC Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Inspection stages
foundation, roughing-in, final
Advance notice required
3 working days
1st/2nd inspection turnaround
within 3 working days
Final inspection turnaround
within 5 working days
Optional safety inspection
owner request + fee
Max penalty for violations
$500 fine / 30 days jail

Summary

Richland County building permits require a set sequence of inspections: foundation, roughing-in, and final. Permit holders must give the Building Official three working days' advance notice, and the county must inspect within three to five working days.

These county ordinances apply to unincorporated areas of Richland County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Roughing-in inspection. Finished floor shall not be installed. All plumbing, heating, and electrical work shall be roughed-in. No interior finish shall be installed on walls or ceilings. All windows and exterior doors shall be set. All exterior woodwork shall be primed and roof shingles shall be in place. The building shall be weather-tight. ... Final inspections. Property shall be completed in all respects, all equipment in place and property ready for occupancy.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-24: This supplement is current through Ordinance No. 033-25HR).

Full Breakdown

Section 6-54 lists the inspection stages the Building Official must perform once notified by the permit holder. The foundation and wall inspection covers footings, piers, and curtain walls before concrete is poured; for slab construction, plumbing must be roughed in and the foundation wall in place before concrete is placed. The roughing-in inspection requires all plumbing, heating, and electrical work roughed in, no interior finish on walls or ceilings, windows and exterior doors set, exterior woodwork primed, roof shingles in place, and the building weather-tight before it can pass.

The final inspection requires the property complete in all respects, equipment in place, walks and drives finished, and grading and landscaping done so water drains away from the building; no reinforcing steel or structural framework may be covered without the Building Official's, architect's, or engineer's approval first. Section 6-53 sets the notice and timing rules: the permit holder must give three working days' advance notice before work is ready for inspection or testing, and must ensure the work will actually pass before calling for it.

In return, the Building Official must perform the first and second inspections within three working days of the requested date, and the final inspection within five working days, provided proper notice was given. If work fails, Section 6-54(d) requires the permit holder to make corrections and have the work re-inspected before proceeding. Section 6-55 lets an owner request an optional safety inspection of work that is not otherwise required, on payment of the inspection fee. No certificate of occupancy issues under Section 6-56 until the Building Official confirms compliance with the building codes.

Violations & Fines

Covering or concealing reinforcing steel or structural framework before the Building Official's approval, or occupying a building before a certificate of occupancy issues under Section 6-56, is a Chapter 6 violation; Section 6-223 sets the penalty at up to a $500 fine, up to 30 days in jail, or both, with each day of continued violation a separate offense.

Frequently Asked Questions

What inspections does Richland County require during construction?
Section 6-54 requires a foundation and wall inspection before concrete is poured, a roughing-in inspection once plumbing, heating, electrical, windows, and roof shingles are in but before interior finish, and a final inspection once the property is complete and ready for occupancy.
How much notice do I need to give before a Richland County inspection?
Section 6-53 requires the permit holder to give the Building Official three working days' advance notice that work is ready for inspection or testing, and to make sure the work will actually pass before calling for it.
How fast will Richland County show up for an inspection?
Section 6-53(c) requires the first and second inspections within three working days of the requested date and the final inspection within five working days, as long as proper advance notice was given.

Sources & Official References

Other rules in Richland County

All Richland County rules

Compare Richland County to another location·View the South Carolina building safety overview

Get notified when Building Inspections in Richland County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Cities Across Richland County