St. Petersburg, FL Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Notification from permit holder
Final step
Final inspection before occupancy
Flood zones
Lowest-floor elevation certification
Coastal A/V zones
ASCE 24 compliance affidavit
Stop-work power
Building Official can halt work on-site

Summary

St. Petersburg's local amendment to the Florida Building Code, Sec. 8-36, requires the Building Official to inspect permitted work on notification from the permit holder, culminating in a final inspection before occupancy, with extra flood-zone certifications where applicable.

110.3 Required inspections. The building official upon notification from the permit holder or his or her agent shall make the following inspections, and shall either release that portion of the construction or shall notify the permit holder or his or her agent of any violations which must be corrected in order to comply with the technical codes. The building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection. Building 6.Final Inspection. To be made after the building is complete and ready for occupancy.6.1In Flood hazard areas, as part of the final inspection, a final certification of the lowest floor elevation shall be submitted to the authority having jurisdiction.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 54).

Full Breakdown

Sec. 8-36(c)(1) amends Florida Building Code Sec. 3, Required Inspections, as adopted locally: upon notification from the permit holder or agent, the Building Official must make the required inspections and either release that portion of the construction or notify the permit holder of violations that must be corrected to comply with the technical codes, with the Building Official determining the timing and sequencing of inspections and what elements are inspected at each stage. The amendment calls out the final inspection, made once the building is complete and ready for occupancy, and layers on flood-specific certification duties in flood hazard areas: a final certification of the lowest floor elevation, and, for flood-proofed nonresidential structures, a completed FEMA Non-Residential Flood Proofing Certification (form 086-0-34); in Coastal A Zones and V/VE Zones, the design professional must also submit a compliance affidavit that the as-built construction meets ASCE 24.

A separate item requires inspection of manufactured building construction, foundations, connections to foundations, site-installed parts, module joining including utility crossovers, and utility connections, with additional inspections possible for public educational facilities. This inspection authority sits alongside the Building Official's broader powers under Sec. 8-36(b)(3), including right of entry to inspect for FBC violations, authority to require an inspection warrant, and power to issue a stop-work notice, posted on site or served on the person doing the work, whenever construction proceeds contrary to the Code or a permit's conditions. The administrative amendments were codified under Ord. No. 907-G and its successors.

Violations & Fines

Failing a required inspection, or continuing work after a stop-work notice under Sec. 8-36(b)(3)c, is enforced as a violation of the Florida Building Code as locally amended, punishable under Sec. 1-7 by a fine up to $500.00, imprisonment up to 60 days, or both; the Building Official may also suspend or revoke the permit under Sec. 8-36(b)(3)d-e.

Frequently Asked Questions

Who decides what gets inspected and when on a St. Petersburg building permit?
The Building Official. Sec. 8-36(c)(1)'s amendment to FBC Sec. 110.3 gives the Building Official authority to determine the timing and sequencing of required inspections and what elements are checked at each one, after the permit holder notifies the department.
What is required for the final inspection on a St. Petersburg building permit?
It occurs after the building is complete and ready for occupancy. In flood hazard areas, the final inspection also requires a lowest-floor-elevation certification, and in Coastal A or V/VE zones a design professional's ASCE 24 compliance affidavit.
Can the Building Official stop work on a St. Petersburg project?
Yes. Sec. 8-36(b)(3)c lets the Building Official require work to stop, by posted or served written notice, whenever construction is being done contrary to the Florida Building Code, another ordinance, or the conditions of the permit.

Sources & Official References

Other rules in St. Petersburg

All St. Petersburg rules

Florida rules heatmap·Compare St. Petersburg to another location·View the Florida building safety overview

Get notified when Building Inspections in St. Petersburg, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.