St. Tammany Parish, LA Building Safety: Building Inspections (2026)
Key Facts
- Enforcing office
- Dept. of Permits and Inspections
- Footing/foundation inspection
- After excavation and rebar, before pour
- Final building inspection
- After construction complete, before occupancy
- CO violation fine
- $100.00 per day (Sec. 300-8.A)
- No sanitary facilities fine
- $50.00 per day (Sec. 300-8.B)
- Fire-rated construction inspector
- State Fire Marshal
- Test meter rule
- Energized before scheduling any final inspection
Summary
St. Tammany Parish's Department of Permits and Inspections requires a sequence of inspections before, during, and after construction under UDC Sec. 300-5.1 through 300-5.3. Work must remain exposed and accessible until the Director signs off on each stage, from the footing and foundation pour through the final building, electrical, mechanical, plumbing, and gas inspections before occupancy.
B.Footing or Foundation Inspection. Footing and foundation inspections shall be made after excavations for footing are complete and any required reinforcing steel is in place, prior to the placing of concrete. The foundation inspection shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports or equipment and special requirements for wood foundations. ... H.Final Inspections. Final inspections for all electrical, mechanical, plumbing, and gas systems shall be made after the electrical, mechanical, plumbing, and gas systems are complete. The final grade inspection shall be made prior to the final building inspection. The final building inspection shall be made after the building is completed and ready for occupancy. Municipal addresses shall be posted on the property and visible from the street. Construction test meters shall be energized prior to scheduling of any final inspection.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 12 Update 2).
Full Breakdown
The Director of Permits and Inspections controls the pace of every project. Under Sec. 300-5.1, the permit holder or an authorized agent must notify the Director when work is ready, and construction cannot proceed past the point covered by each inspection until the Director approves it; anything that fails must be corrected before it is covered or concealed. Before a permit is even issued, the Director can conduct a preliminary inspection of the site under Sec. 300-5.1.D.
Sec. 300-5.3 lays out the specific inspection points. The footing or foundation inspection happens after excavation is complete and reinforcing steel is set, but before concrete is poured, and it must follow an approved preliminary grade inspection and any underground plumbing inspection. The concrete slab or under-floor inspection follows, checked after in-slab or under-floor steel, conduit, piping, and equipment are placed but before concrete or floor sheathing goes down. Rough-in and framing inspections are listed as reserved in this volume. Fire-resistance-rated commercial construction between dwelling units is inspected by the State Fire Marshal after lathing or wallboard is up but before plaster or taping, and fire-resistant penetrations cannot be concealed until inspected.
The final inspection comes last: electrical, mechanical, plumbing, and gas systems are checked once complete, the final grade inspection precedes the final building inspection, and the building inspection itself happens only after the structure is finished and ready for occupancy. A municipal address must be posted and visible from the street, and the construction test meter must be energized before any final inspection can be scheduled. The Director can also accept reports from outside approved agencies that meet the parish's qualification and reliability standards under Sec. 300-5.1.H.
Violations & Fines
Occupying a building before its final inspections clear and a certificate of occupancy issues carries a $100.00-per-day fine against the contractor of record under Sec. 300-8.A, with stop-work orders placed on all of that contractor's active permits until the violation is corrected. Failing to provide sanitary facilities on the job site draws a separate $50.00-per-day fine under Sec. 300-8.B, also enforced through stop-work orders on active permits.
Frequently Asked Questions
Who conducts building inspections in unincorporated St. Tammany Parish?
What happens if I skip an inspection stage?
When is the final building inspection scheduled?
Sources & Official References
Other rules in St. Tammany Parish
Compare St. Tammany Parish to another location·View the Louisiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.