Cambridge, MA Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing chapter
City Code Ch. 15.12
New plumbing, up to 5 fixtures
$50.00
Additional fixture fee
$5.00 each
Unpermitted work penalty
Triple the fee
Late final inspection fee
$50.00
Fee schedule effective
June 1, 2009

Summary

Cambridge charges permit fees for all plumbing and gas fitting work under City Code Chapter 15.12, with new plumbing installs starting at $50.00 for up to five fixtures. Starting work before a permit issues triples the fee.

15.12.030 - Plumbing and gas fitting fee schedule. Effective June 1, 2009, plumbing and gas fitting fees shall be as follows:

1. Ovens, kitchen range, space heaters, dryers $20.00 each plus gas permit

2. Heating units, each 25.00 plus gas permit

4. New plumbing up to: a. 5 fixtures 50.00 b. Above 5 fixtures 5.00

13. Failure to call for final inspections within 10 working days after completion 50.00

14. Reinspection of code violations 50.00

Full Breakdown

12, sets a schedule that Inspectional Services uses to charge for every plumbing and gas fitting permit issued in the city, effective June 1, 2009. 00 for each fixture beyond five; alterations to existing plumbing are billed the same way. 00. 00 per ton above that. 00. 010 penalizes starting plumbing or gas work before obtaining the required permit: the fee that would otherwise apply is tripled, though paying the triple fee does not excuse the contractor from complying with the code or from any other prescribed penalties.

020 can obtain a single covering permit for a set period rather than filing separately for each job, billed as if each job had its own permit. The current fee schedule was set by Ordinance No. 1326, adopted May 18, 2009, replacing the prior 1995 schedule under Ordinance No. 1169.

Violations & Fines

Commencing plumbing or gas fitting work without first obtaining the required permit triples the standard fee under Section 15.12.010. Failing to call for a final inspection within 10 working days of completing the work costs an added $50.00, and any reinspection needed because of a code violation found on-site is billed at $50.00 as well.

Frequently Asked Questions

How much does a Cambridge plumbing permit cost for a small job?
Under City Code Section 15.12.030, new plumbing work covering up to five fixtures costs $50.00, and each additional fixture beyond five adds $5.00. Alterations to existing plumbing are billed on the same $50.00-plus-$5.00-per-fixture scale.
What happens if I start plumbing work in Cambridge before pulling a permit?
Section 15.12.010 triples whatever fee would otherwise apply. Paying the tripled fee does not excuse you from meeting every code requirement for the work or from any other penalty the code prescribes for the violation.
Does Cambridge charge extra for missing a final inspection?
Yes. Section 15.12.030 lists a $50.00 charge for failing to call for a final inspection within 10 working days after the plumbing or gas work is completed, plus a separate $50.00 reinspection fee if a code violation is found.

Sources & Official References

Other rules in Cambridge

All Cambridge rules

Compare Cambridge to another location·View the Massachusetts building safety overview

Get notified when Plumbing Permits in Cambridge, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.