Concord, NC Building Safety: Plumbing Permits (2026)
Key Facts
- Permit required for
- Connecting plumbing to Concord Utilities System
- Applications from
- Cabarrus County
- Additional sign-off
- City Manager or designee (§62-34(b))
- State code referenced
- North Carolina Plumbing Code
- Code section
- § 62-33
Summary
Concord will not connect any property to Concord Utilities water or sewer service unless the owner has first obtained a plumbing permit from the appropriate permitting agency, with applications and procedures handled through Cabarrus County rather than a separate city permitting office.
(a)Activities requiring a permit. No person shall receive water or sewer service from the Concord Utilities System, unless such person shall have applied for and shall have received from the appropriate permitting agency a plumbing permit and shall have complied with such conditions, if any, as are prescribed by such permit. Activities prohibited without a plumbing permit include the connection of plumbing not owned by the City to the Concord Utilities System.(b)Application requirements. Applications and application procedures for plumbing permits shall be obtained from Cabarrus County.
Full Breakdown
Section 62-33 of the Concord City Code, in the water and sewer service article of the utilities chapter, prohibits any person from receiving water or sewer service from the Concord Utilities System unless that person has applied for and received a plumbing permit from the appropriate permitting agency and complied with any conditions the permit imposes; connecting plumbing that the City does not own to the Concord Utilities System without that permit is expressly listed as a prohibited activity. Subsection (b) sends applicants to Cabarrus County for the plumbing permit application itself and its procedures, since Concord does not run a separate municipal plumbing permit desk.
Section 62-34(b) adds a second layer: no one may connect to a plumbing fixture, drain, waste, soil or vent pipe, or the water supply system, without first obtaining permission from the city manager or a designee, and the connection must be made under the supervision of the engineering department or Concord Utilities. Before requesting service activation, section 62-38 requires the customer to physically inspect and verify that every pipe is properly connected in accordance with the North Carolina Plumbing Code so the building will not flood, and it states plainly that neither the City nor Concord Utilities is liable for flooding damage caused when faucets or openings are left open or improperly connected.
Large-capacity connections, defined under section 62-34(f) as water lines over two inches or sewer lines over four inches in diameter, require the customer to submit design data and obtain plan approval from the Director of Water Resources, the Director of Wastewater Resources and the Backflow Prevention Administrator before work begins.
Violations & Fines
Connecting plumbing not owned by the City to the Concord Utilities System without the required permit is expressly listed as a prohibited activity under section 62-33(a). Concord Utilities may refuse or discontinue service to noncompliant connections, and section 62-38 shifts liability for any resulting flooding damage to the customer whose pipes were not properly connected or inspected before activation.
Frequently Asked Questions
Do I need a permit to connect my plumbing to Concord's water system?
Where do I apply for a plumbing permit in Concord, NC?
Who is liable if my new plumbing connection floods my house?
Sources & Official References
Other rules in Concord
Compare Concord to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.