Kankakee County, IL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Code Sec. 105-66
Plumbing standard adopted
Illinois Plumbing Code, Sec. 105-186(9)
Permit commencement window
6 months, Sec. 105-75(b)
Licensed plumber registration
Fee/bond exempt, Sec. 105-288(d)
Unpermitted work surcharge
Sec. 105-131(d)

Summary

In unincorporated Kankakee County, no plumbing installation or alteration may start without a building permit from the Building Division under Sec. 105-66, and Sec. 105-186(9) makes the Illinois Plumbing Code the standard the county enforces rather than a locally drafted plumbing chapter.

These county ordinances apply to unincorporated areas of Kankakee County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

It shall be unlawful to construct, enlarge, alter or demolish a structure; or change the occupancy of a building or structure requiring greater strength, exit, or sanitary provisions; or to change to another use; or to install or alter any equipment for which provision is made or the installation of which is regulated by this chapter, without first filing an application with the building division in writing and obtaining the required permit thereafter. ... The technical codes listed in this section are hereby adopted as the building codes of the county for the control of buildings and structures as herein provided. ... (9)Illinois Plumbing Code.

Full Breakdown

" Plumbing work qualifies, and Sec. 105-212(13), amending the International Building Code, confirms the mechanism by ordering the county's own Chapter 29 Plumbing Systems deleted and replaced: "Chapter 29 Plumbing systems. " Applicants file with the Building Division of the County Planning Department under Sec. 105-67, pay the fee set in the Chapter 18 fee schedule under Sec. 105-70, and the code enforcement officer inspects the work under Sec. 105-72 before it can be concealed. Plumbing contractors performing this work must still register under Article III, but Sec.

105-288(d) carves out an exception: "Plumbing and irrigation contractors are exempt from the fee and bond requirements per 225 ILCS 320/42 of the Plumbing Licensing Law," provided a completed application, certificate of insurance, state license copy, and plumbing contractor certificate stay on file with the county. Beginning plumbing work before the permit issues triggers an added fee under Sec. 105-131(d), on top of the standard permit cost, and every plumbing permit expires under the same six-month commencement window and one-year limit that governs other building permits under Sec. 105-75.

Violations & Fines

Installing or altering plumbing without first obtaining the required permit is enforced under Sec. 105-131: the code enforcement officer serves a written notice of violation, and Sec. 105-131(d) adds a separate surcharge for work started before permitting. Continued noncompliance draws a fine of up to $500.00 with each day a separate offense, and the Building Division may suspend the permit under Sec. 105-131(f) until the plumbing is corrected.

Frequently Asked Questions

Do I need a county permit to replace or add plumbing in unincorporated Kankakee County?
Yes. Section 105-66 makes it unlawful to "install or alter any equipment...regulated by this chapter" without first filing a written application with the Building Division and obtaining a permit before work begins, and this applies directly to plumbing installations and alterations.
What plumbing code does the county enforce?
Section 105-186(9) adopts the Illinois Plumbing Code as the county's plumbing standard, and Sec. 105-212(13) confirms the change by deleting the International Building Code's own plumbing chapter and inserting the Illinois Plumbing Code in its place for all unincorporated-area work.
Do plumbers have to register with the county before pulling a permit?
General contractors and subcontractors must register under Article III, but Sec. 105-288(d) exempts state-licensed plumbing and irrigation contractors from the registration fee and bond, so long as their state license, insurance certificate, and plumbing contractor certificate stay on file with the county.
How long is a plumbing permit good for?
Under Sec. 105-75, the authorized work must commence within six months of issuance or the permit becomes void, and the permit itself expires after one year unless the code enforcement officer grants a written extension based on an agreed construction schedule.

Sources & Official References

Other rules in Kankakee County

All Kankakee County rules

Compare Kankakee County to another location·View the Illinois building safety overview

Get notified when Plumbing Permits in Kankakee County, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.