Lake County, IN Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- Indiana Plumbing Code 1985 (IPC, eff. 5-2-1986)
- Permit issued by
- County Planning and Building Department
- Plumbing fee
- $2 per fixture, $15 minimum
- Permit validity
- Two years from issuance
- Void if unstarted
- After six months per § 151.023(A)(2)
- Violation fine
- $500 to $2,500 under § 151.999(C)(5)
Summary
Plumbing work on a building or structure in unincorporated Lake County falls under the same building permit § 151.020 requires, built on the 1985 Indiana Plumbing Code the county adopted by reference in § 151.004(A)(7). The Planning and Building Department charges $2 per fixture, and plumbing permit violations draw a $500-$2,500 fine.
(A) A permit shall be obtained before beginning construction, alteration, repair, or maintenance of any building or structure in the unincorporated areas of the county or cause the same to be done without first obtaining a separate permit for each such building or structure from the County Planning and Building Department. ...
(A) The following rules, regulations, and codes are hereby adopted by reference as the rules and regulations governing the construction and alterations of buildings and structures in the unincorporated areas of the county...
(7) Indian Plumbing Code 1985 (IPC, 5-2-1986); ... Plumbing fees $2 per fixture $15
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-14: Supplement contains: Local legislation current through 6-9-2026; and State legislation current through Indiana Legislative Service, 2025 Acts, Pamphlet No. 3).
Full Breakdown
Lake County adopted the Indiana Plumbing Code (IPC, effective 5-2-1986) by reference in § 151.004(A)(7), together with later amendments published in the Indiana Register or Indiana Administrative Code. Section 151.020(A) requires a permit before beginning construction, alteration, repair or maintenance of a building or structure in the unincorporated county from the County Planning and Building Department, and plumbing installed as part of that work falls under the same permit. Section 151.021 requires the application to include a plat or sketch, plans and specifications, and a sworn affidavit form supplied by the Building Department.
The § 151.043 fee schedule prices plumbing separately from the base building fee at $2 per fixture with a $15 minimum. Section 151.025(A) schedules a rough plumbing inspection and a final plumbing inspection among the minimum inspections required for every permit; work found out of compliance at inspection draws an additional $50 fee under § 151.025(B), and a re-inspection after correction costs another $50 under § 151.025(C). A permit is valid for two years from the date of issuance under § 151.023(B), and unused permits are voided if construction has not started within six months under § 151.023(A)(2). Section 151.026 allows an appeal of a Building Department decision to the County Board of Zoning Appeals and then to the Indiana Fire Prevention and Building Safety Commission under I.C. 22-12-7-11 or 22-12-7-12.
Violations & Fines
Section 151.999(C)(5) sets a fine of $500 to $2,500 for plumbing permit violations specifically, alongside the $500-$2,500 fines the same section sets for general building-code and permit violations and the $750-$2,500 fine for a stop-work-order violation.
Frequently Asked Questions
What plumbing code does unincorporated Lake County use?
How much does a plumbing permit cost?
How long is a plumbing permit good for?
Sources & Official References
Other rules in Lake County
Compare Lake County to another location·View the Indiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.