Porter County, IN Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- Indiana Plumbing Code, 675 IAC Article 16
- Permit required
- Before construction/alteration commences (Sec. 6-209)
- Certificate of occupancy
- Required before use (Sec. 6-212)
- Permit expiration
- 180 days to start, 24 months to finish
- Max fine
- $2,500.00 per violation
Summary
Porter County enforces the Indiana Plumbing Code (675 IAC Article 16) by reference, and plumbing work performed as part of a structure's construction or alteration requires a building permit from the building commissioner before work begins.
Pursuant to IC 22-13-2-3(b), the building rules of the state fire prevention and building safety commission, as set out in the following articles of title 675 of the Indiana Administrative Code, are incorporated by reference in this Code and shall include any later amendments to those rules... (4)Article 16—Indiana Plumbing Code.
Full Breakdown
Sec. 6-138 of the county code incorporates the building rules of the state fire prevention and building safety commission, listed by article of 675 IAC, into the county code, and Article 16, the Indiana Plumbing Code, is named specifically among the ten adopted articles, along with any later state amendments to those rules. 4 for anyone to inspect. Plumbing installations tied to construction, alteration or repair of a building fall under the county's general permitting scheme in Article V: Sec. 6-209 bars any structure from being built, altered, changed, placed, removed or erected without a permit issued by the building commissioner, and requires an improvement location permit before excavation, footings or foundation work begin.
Sec. 6-210 requires the application to include plans and specifications showing the work to be done, and imposes up to a five-working-day wait after the improvement location permit issues. A design release from the state building commissioner and state fire marshal under IC 22-15-3-1 must be attached where applicable. Permits lapse under Sec. 6-211 if work is not started within 180 days or finished within 24 months, and no certificate of occupancy issues under Sec. 6-212 until the building commissioner signs off that the permitted work was completed. Sec. 6-107 lets the building commissioner withhold new permits from anyone who owes outstanding fees, including returned checks, on a prior permit.
Violations & Fines
A person who performs plumbing work without the required permit, or in violation of the adopted plumbing code, is subject to a fine of up to $2,500.00 under Sec. 6-111; the building commissioner may also revoke the permit under Sec. 6-108 or issue a stop-work order under Sec. 6-109, and an aggrieved permit holder can appeal to the fire prevention and building safety commission or to the county board of commissioners under Sec. 6-112.
Frequently Asked Questions
Does Porter County write its own plumbing code?
Can the county refuse to issue me a new plumbing permit?
When does a Porter County permit expire?
Sources & Official References
Other rules in Porter County
Compare Porter County to another location·View the Indiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.