Kane County, IL Building Safety: Plumbing Permits (2026)
Key Facts
- Governing code
- Illinois Plumbing Code, per §§ 6-4, 6-6
- Permitting agency
- Building & Community Services Division
- Residential fee
- $90/100 sq ft, $3,000 minimum (§ 6-12.A)
- Commercial fee
- $120/100 sq ft, $3,000 minimum (§ 6-12.B)
- Permit expiration
- 2 years if work incomplete (§ 6-2, Sec. 105.5)
- Unpermitted work penalty
- Fee doubled, 100% surcharge (§ 6-12.P)
- General violation fine
- Up to $500 per day (§ 1-11)
Summary
Every plumbing installation in unincorporated Kane County must follow the Illinois Plumbing Code, which the county substituted wholesale for the plumbing chapters of the model building codes it otherwise enforces. The Building & Community Services Division issues the permit, charging a $3,000 minimum fee for new residential construction that includes wiring, plumbing and water supply.
Part VII Plumbing Delete the following chapters:
Chapter 25 Plumbing Administration Chapter 26 General Plumbing Requirements Chapter 27 Plumbing Fixtures Chapter 28 Water heaters Chapter 29 Water Supply and Distribution Chapter 30 Sanitary Drainage Chapter 31 Vents Chapter 32 Traps
Insert the following text: “The design and installation of all plumbing shall be in accordance to the Illinois Plumbing Code and all other applicable federal, state and local ordinances.” (Ord. 12-366, 12-11-2012, eff. 1-1-2013; amd. Ord. 21-475, 11-9-2021)
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-17: Code current through: Ord. 26-183, passed 4-14-2026).
Full Breakdown
Kane County stripped the plumbing chapters out of both model codes it enforces and replaced them with a single cross-reference to state law. Under the Chapter 6 amendments to the 2021 International Residential Code (Kane County Code § 6-4, Part VII Plumbing), the county deletes Chapters 25 through 32 covering plumbing administration, fixtures, water heaters, water supply, drainage, vents and traps, and instead requires that plumbing design and installation follow the Illinois Plumbing Code. The identical substitution applies to commercial and other new construction under § 6-6, which deletes Chapter 29 Plumbing Systems of the 2021 International Building Code for the same reason.
1. Permit fees for new construction that includes wiring, plumbing and water supply run $90 per 100 square feet of floor area (three-thousand-dollar minimum) for one- and two-family homes, or $120 per 100 square feet ($3,000 minimum) for other construction, under the § 6-12 fee schedule. General permits expire after two years if work is not completed. 8. Starting plumbing work before a permit is issued doubles every fee listed above under § 6-12(P).
Violations & Fines
Working without a permit doesn't just risk a stop-work order: County Code § 6-12(P) doubles the permit fee outright once installation starts before approval. Beyond that, the county's general penalty clause, § 1-11, makes any uncited code violation punishable by a fine of up to $500, with each day the violation continues charged as a separate offense. Permit decisions can be appealed to the county's Development Committee within 20 days under § 6-2, Section 113.1.
Frequently Asked Questions
Do I need a permit for plumbing work in unincorporated Kane County?
How much does a plumbing permit cost in Kane County?
What happens if I start plumbing work before getting a permit?
How long is a Kane County plumbing permit valid?
Sources & Official References
Other rules in Kane County
Compare Kane County to another location·View the Illinois building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.