Walla Walla County, WA Building Safety: Plumbing Permits (2026)
Key Facts
- Code adopted
- Uniform Plumbing Code, current edition
- Excepted chapter
- UPC Chapter 12 (fuel gas piping)
- Unpermitted work penalty
- Double the permit fee
- Exception
- Emergency work where a permit is impractical first
- Fees set by
- WWCC Chapter 3.08
Summary
Unincorporated Walla Walla County requires a plumbing permit under the adopted Uniform Plumbing Code for regulated plumbing work, with fees set in Chapter 3.08, and starting work before the permit issues doubles the fee except for emergency repairs that cannot practically wait.
The Uniform Plumbing Code, current edition, as adopted, amended or hereafter amended by the state of Washington and published by the International Association of Plumbing and Mechanical Officials, is adopted, excepting Chapter 12, fuel gas piping. ... Every applicant for a plumbing permit to do work regulated by this code shall pay for each permit, the fee as set forth in Chapter 3.08. Any person who commences any work without first obtaining a permit shall, if subsequently permitted to obtain a permit, pay double the permit fee for work conducted, however, these provisions shall not apply to emergency work where it is not practical to obtain a permit before commencement of the work.
Full Breakdown
Walla Walla County Code § 15.04.150 adopts the current edition of the Uniform Plumbing Code, as amended by the state of Washington and published by the International Association of Plumbing and Mechanical Officials, excepting Chapter 12 on fuel gas piping, which the county instead covers under its adopted fuel gas codes. § 15.04.160 then requires every applicant for a plumbing permit covering work regulated by that code to pay the fee set in Chapter 3.08 for each permit. Anyone who starts plumbing work before obtaining the required permit, and is later granted one anyway, must pay double the permit fee for the work already performed.
The chapter carves out one exception: the double-fee penalty does not apply to emergency work where getting a permit first is not practical. Beyond the permit itself, § 15.04.036's application-fee and plan-review deposit requirements apply to plumbing permit applications that require plan review, and the application is treated as vested once that fee is paid to the community development department. The building official enforces plumbing compliance with the same tools used chapter-wide: right of entry to inspect under § 15.04.250, a stop-work order under § 15.04.260 if plumbing work is proceeding contrary to code, and referral for misdemeanor prosecution under § 15.04.034 and RCW 36.43.040 if corrective action is not completed.
Violations & Fines
Doing plumbing work without a permit first doubles the fee under § 15.04.160's own terms, unless it qualifies as emergency work. Continuing unpermitted or non-compliant plumbing after a stop-work order under § 15.04.260 is a misdemeanor under § 15.04.034 and can draw Chapter 14.13's $250-per-day civil penalty.
Frequently Asked Questions
What plumbing code applies in unincorporated Walla Walla County?
What happens if I do plumbing work before getting a permit?
Who enforces plumbing violations in the county?
Sources & Official References
Other rules in Walla Walla County
Compare Walla Walla County to another location·View the Washington building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.