Skip to main content
CityRuleLookup

Bryan, TX Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Maximum coverage
75% of lot in most districts
Downtown/Industrial
no maximum coverage listed
Governing section
§ 62-161 lot standards table
Landscape-review projects
governed instead by § 62-429

Summary

In most Bryan zoning districts, total lot coverage, buildings, parking, driveways, and other impervious surfaces, cannot exceed 75% of the lot under the Chapter 62 building setback and lot standards table.

Lot coverage shall mean the impervious area of a lot covered; including, but not limited to, the area covered by parking spaces, driveways, sidewalks, rocked areas, and equipment pads located thereon. ... The maximum coverage of a lot by structures, and associated parking spaces, driveways, sidewalks, and equipment pads, etc., in each district shall not exceed the provisions listed in this article.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 31).

Full Breakdown

Bryan's Article IV lot standards table (§ 62-161) caps maximum lot coverage, the impervious area covered by structures, parking, driveways, sidewalks, and equipment pads, at 75% in the A-O, R-NC, RD-7, RD-5, MF, C-1, C-2, C-3, and MU-2 districts. Downtown (DT-N/DT-S/DT-C) and Industrial (I) districts carry no maximum figure in the table. Section 62-162(d) makes the cap mandatory: coverage 'shall not exceed the provisions listed in this article.' A footnote limits the 75% figure to development not requiring landscape plan review; projects that do trigger review are instead bounded by the 15%-landscaped-area rule in § 62-429, which cross-references the § 62-161 cap directly.

Violations & Fines

Site plans exceeding the cap are not approved; building permits and certificates of occupancy are withheld until the plan is revised to meet § 62-161's coverage limit.

Frequently Asked Questions

Does the 75% cap apply everywhere in Bryan?
No. It applies to most residential and general commercial districts (A-O, R-NC, RD-7, RD-5, MF, C-1, C-2, C-3, MU-2). Downtown and Industrial districts have no listed maximum, and Midtown corridor lots follow §§ 62-559–62-561 instead.
What counts toward lot coverage?
Per § 62-1, lot coverage is impervious area, including buildings plus parking spaces, driveways, sidewalks, rocked areas, and equipment pads, not just the building footprint.

Sources & Official References

Other rules in Bryan

All Bryan rules

Texas rules heatmap·Compare Bryan to another location·View the Texas building setbacks & zoning overview

Get notified when Lot Coverage Limits in Bryan, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.