Corpus Christi, TX Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- Clustered development cap
- 65% of development boundary
- Cottage development sitewide cap
- 65% impervious
- Individual cottage lot cap
- 75% impervious
- Governing article
- UDC § 6.7 and § 4.7
- Standard RS/RM districts
- no stated % cap; open-space minimum instead
- Review point
- site plan / plat approval
Summary
Corpus Christi's Unified Development Code sets no single citywide lot-coverage percentage for standard RS or RM lots; those districts instead run on minimum open-space percentages. Where the UDC does cap impervious surface by percentage, it applies to two specific development types: Clustered Developments (65% of the development boundary) and Cottage Housing Developments (65% sitewide, 75% per individual cottage lot).
E. Impervious Coverage Allowance.
The maximum impervious coverage of the entire clustered development cannot exceed 65% of the development boundaries, which includes parking areas, unless the parking areas consist of pervious surfaces.
Full Breakdown
B) regulate site coverage indirectly through a "Min. 5 is not subject to a numeric impervious cap in the UDC text itself. Percentage-based impervious limits appear only where the Code creates a distinct development type. E, "Impervious Coverage Allowance," caps the entire clustered development, including parking areas, at 65% of the development boundaries unless those parking areas are built with pervious surfaces, in which case they do not count against the cap. 7. B). C). 7 site plan requirements (Cottage), and Development Services checks the calculation before plat or permit approval.
Violations & Fines
A site plan or plat showing impervious coverage above the applicable 65%/75% cap is rejected by Development Services at plan review; the applicant must redesign, add qualifying pervious paving, or document BMP-Manual retention credit before resubmitting. Because these caps are development-standard conditions of the Clustered Development Overlay or Cottage Housing Article rather than separate criminal offenses, the Code does not set a distinct fine schedule for exceeding them; enforcement runs through withholding of plat/plan approval and, for built projects, through the general Code compliance process for constructing without an approved plan.
Frequently Asked Questions
What is the maximum lot coverage for a regular house lot in Corpus Christi?
How much impervious surface can a Clustered Development have?
Is the cottage lot cap different from the whole-development cap?
Can porous pavement increase how much impervious area I can build?
Sources & Official References
Other rules in Corpus Christi
Texas rules heatmap·Compare Corpus Christi to another location·View the Texas building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.