Skip to main content
CityRuleLookup

Green Bay, WI Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

RR District cap
40% impervious max
R1 District cap
50% impervious max
R2 District cap
60% impervious max
R3 District cap
70% impervious max
Small pre-2015 lots
up to 80% allowed

Summary

Green Bay caps impervious surface, buildings, driveways, and paved areas, between 40% and 70% of a lot, with the limit set by zoning district: 40% in RR, 50% in R1, 60% in R2, and 70% in R3.

Impervious surface, including all buildings, drives, and other paved areas, shall not cover more than 40 percent of any zoning lot located in the RR District, 50 percent of any zoning lot located in the R1, 60 percent of any zoning lot in the R2 Districts, or 70 percent of any zoning lot in the R3 District. For lots developed or created prior to December 3, 2015 which contain 7500 square feet or less in area; the impervious surface including all buildings, driveways, and other paved areas, shall not contain more than 40 percent of any zoning lot located in the RR District, 60 percent of any zoning lot located in the R1, 70 percent of any zoning lot in the R2 Districts, or 80 percent of any zoning lot in the R3 District. See the following graphic:

Impervious Surface Coverage

Impervious Surface Coverage

(Code 1984, § 13.609; Ord. No. 29-25, § 1, 12-2-2025)

Full Breakdown

Section 44-559 sets a hard cap on impervious surface, every building, driveway, and paved area on a lot, by residential district: 40 percent in the RR District, 50 percent in R1, 60 percent in R2, and 70 percent in R3. Lots of 7,500 square feet or less that were platted before December 3, 2015 get a higher allowance instead: 40, 60, 70, or 80 percent respectively. The rule applies citywide in the residential zoning districts and is measured against the full area of the zoning lot, not just the building footprint.

Violations & Fines

Site and building plans that exceed the district's impervious cap won't get zoning approval, and a lot already over the limit is nonconforming: it can't add more paved or built area without a variance.

Frequently Asked Questions

What counts as impervious surface under Green Bay's cap?
Any area that sheds rainwater instead of absorbing it, buildings, driveways, patios, and other paved surfaces, counts toward the district's maximum coverage percentage.
Does a small older lot get more coverage?
Yes. Lots of 7,500 sq. ft. or less platted before December 3, 2015 get a higher cap: up to 80% in the R3 District.

Sources & Official References

Other rules in Green Bay

All Green Bay rules

Compare Green Bay to another location·View the Wisconsin building setbacks & zoning overview

Get notified when Lot Coverage Limits in Green Bay, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Lot Coverage Limits in Nearby Cities

How other cities in Brown County handle lot coverage limits.

De Pere, WI
Some Restrictions