Saint Paul, MN Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- RL large lot max coverage
- 40% of lot
- H1 residential max coverage
- 45% of lot
- H2 residential max coverage
- 50% of lot
- Density bonus coverage add-on
- +5% with affordable units
- Administering agency
- DSI zoning staff
- Base penalty for violation
- Misdemeanor, up to $1,000
Summary
Saint Paul caps how much of a residential lot buildings can cover: 40% in the RL large-lot district, 45% in H1, and 50% in H2, per the Zoning Code's dimensional standards table. A density bonus can add 5% more coverage if affordable units are included.
Zoning District ... Maximum lot coverage for all buildings (sq. feet) (f) ... (percent of the lot) (f) RL large lot (l) 9,000 (a) 60 2 35 30 (d) 10 (e) 10 40% H1 residential (l) 1,500 (a) 30 4 (b) 35 10 (d) 5 (e) 10 45% H2 residential (l) 1,000 (a) 25 5 (b) 39 (c) 10 (d) 5 (e) 10 50%
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 133 Update 1).
Full Breakdown
231 of the Saint Paul Zoning Code sets maximum lot coverage for all buildings, expressed as a percentage of the lot, for each residential zoning district: RL large lot is capped at 40%, H1 residential at 45%, and H2 residential at 50%. These percentages apply on top of the district's minimum lot area and width standards and are administered by the Department of Safety and Inspections (DSI) zoning staff when reviewing building permits. Footnote (b) allows an owner to exceed the base cap by an additional five percent of lot coverage, combined with up to two extra dwelling units in H1 or one in H2, if the project qualifies under one of four bonus paths: leasing at least 20% of units at or below 60% of area median income (AMI) rents for ten years, selling units affordable to buyers earning up to 80% AMI, adding a unit with three or more bedrooms, or retaining at least half the floor area of an existing structure in a conversion.
Before a building permit issues for the bonus, the owner must record a deed restriction, city contractual agreement, or HRA financing agreement documenting the affordability commitment, and post-occupancy income documentation is required. 130(c) and are not governed by this table. RM1, RM2 and RM3 multiple-family districts are instead regulated by floor area ratio (FAR) rather than a lot-coverage percentage.
Violations & Fines
Building without a permit that exceeds the district's lot-coverage cap is enforced by DSI zoning inspectors as a Legislative Code violation. Under Sec. 1.05, any violation of the Legislative Code is a misdemeanor punishable by up to a $1,000 fine, up to 90 days imprisonment, or both; violations carrying only a stated fine are petty misdemeanors capped at $300.
Frequently Asked Questions
What is the maximum lot coverage in Saint Paul's RL district?
Can a Saint Paul property exceed the base lot-coverage cap?
Do RM1-RM3 multi-family districts have a lot-coverage percentage?
Sources & Official References
Other rules in Saint Paul
Compare Saint Paul to another location·View the Minnesota building setbacks & zoning overview