Key Facts

Max lot coverage
70% of site in HTCD zoning
Governing section
Code § 405.165(A)(5)
Counted surfaces
Buildings plus access, loading, parking paving
Penalty
Up to $500/day or 6 months jail
Variance fee
$250 to Board of Zoning Adjustment
Appeal window
14 working days to County Council

Summary

St. Charles County caps impervious lot coverage at 70 percent in its High Technology Corridor District under Code § 405.165(A)(5), counting every building and every square foot of paving used for access, circulation, loading, or parking toward that limit. The Division of Planning and Zoning checks the cap against the required site development plan before an HTCD project breaks ground.

These county ordinances apply to unincorporated areas of St. Charles County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Lot coverage. The maximum lot coverage shall not exceed seventy percent (70%). This represents that portion of the site which is covered by impermeable surfaces, such as buildings or paving for access, circulation, loading, and parking.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4863880; v61 updated 2026-05-11; through 05-11-2026).

Full Breakdown

165(A) of the Unified Development Ordinance sets the development standards for land zoned High Technology Corridor District (HTCD), the county's business-park zone. Subsection (A)(5), titled "Lot coverage," states: "The maximum lot coverage shall not exceed seventy percent (70%). " The cap works alongside the district's other dimensional standards in the same section: a 100-foot minimum lot width (200 feet on lots of five acres or more), 30-foot front and rear yards, 20-foot side yards (30 feet on a corner lot), and a 60-foot height limit.

Before any HTCD parcel is graded or built on, the applicant must submit a preliminary site development plan and building elevations to the Planning and Zoning Commission showing every proposed paved surface, together with a preliminary subdivision plat reviewed under Chapter 410; the 70% ceiling is measured against that plan, not self-certified after construction. The Director of the Division of Planning and Zoning enforces Chapter 405 countywide. 645, the Director can inspect a site, issue a written order to remedy a violation, and require that offending construction or use stop, immediately for active building work.

650 also lets the County Counselor, the Prosecuting Attorney, or an affected neighboring owner sue in Circuit Court to enjoin the violation. 020(C)(1). 639(A), or taken directly to Circuit Court under Chapter 536, RSMo.

Violations & Fines

Building or paving beyond the 70% HTCD lot-coverage cap is a misdemeanor under Section 405.655: a fine of up to $500 per day, up to six months in the county jail, or both, with every day the excess pavement or building remains counted as a separate offense. The Director of Planning and Zoning can also issue a written stop-work order under Section 405.645, and the County or an aggrieved neighboring owner may sue in Circuit Court under Section 405.650 to force removal of the noncompliant coverage.

Frequently Asked Questions

What is the maximum lot coverage allowed in St. Charles County's HTCD zoning?
In the county's High Technology Corridor District, Section 405.165(A)(5) caps lot coverage at 70 percent of the site. That percentage counts every impermeable surface, meaning buildings plus all paving used for access, circulation, loading, and parking, not just the building footprint alone.
What counts toward the 70% impervious limit?
The code defines covered area as the portion of the site covered by impermeable surfaces, such as buildings or paving for access, circulation, loading, and parking (Section 405.165(A)(5)). Landscaped ground and open space are excluded, but every drive aisle, loading apron, and parking stall counts against the 70 percent.
What happens if a project exceeds the lot coverage cap?
The Director of the Division of Planning and Zoning can issue a written order to stop the violation under Section 405.645, and exceeding the cap is a misdemeanor under Section 405.655 punishable by up to $500 per day or six months in jail, with each day of continued violation a separate offense.
Can a property owner get relief from the 70% cap?
Yes. The owner can apply to the five-member Board of Zoning Adjustment for a variance for a $250 fee under Section 425.020(C)(1). If the Board denies the request, the owner can appeal to the County Council within 14 working days under Section 405.639, or go directly to Circuit Court under Chapter 536, RSMo.

Sources & Official References

Other rules in St. Charles County

All St. Charles County rules

Compare St. Charles County to another location·View the Missouri building setbacks & zoning overview

Get notified when Lot Coverage Limits in St. Charles County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.