Skip to main content
CityRuleLookup

Texas City, TX Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

District A principal structure
40% maximum lot coverage
District A-2 principal structure
50%
District A-2 with driveways and parking
60%
Offices and neighborhood service
40% structures, 90% with driveways and parking
Measurement
Base (first story or floor) of buildings
Permit check
Building Official reviews scaled plan under § 160.111

Summary

Texas City, Texas caps lot coverage district by district. In District A the principal structure can cover 40% of the lot, measured by the base of buildings on the first story or floor. Patio home lots in District A-2 allow 50% for the principal structure and 60% with driveways and parking, and commercial districts run higher.

LOT COVERAGE. The percentage of the total area of a lot occupied by the base (first story or floor) of buildings located on the lot. ... (D) Area and height requirements. ... Maximum ... lot coverage by principal 40% structure

Full Breakdown

Texas City Code of Ordinances § 160.006 defines lot coverage as the percentage of the total area of a lot occupied by the base (first story or floor) of buildings located on the lot. The limit itself is set in each district's area and height table in chapter 160, so the number depends on the zoning of the parcel in Texas City, Galveston County.

District A, single-family residential (§ 160.024(D)), sets maximum lot coverage by the principal structure at 40%, alongside a 6,000 square foot minimum lot area per dwelling unit, a 25 foot front yard, a 20 foot rear yard and a 5 foot minimum side yard. District A-1 (§ 160.025(D)) also sets 40%, with a 8,200 square foot minimum lot area and a 30 foot front yard.

District A-2, patio homes (§ 160.026(D)), sets 50% for the principal structure and adds a second cap: maximum lot coverage by structures, driveways and parking of 60%. That second figure works as the impervious limit for the lot. District B (duplex) uses 40% and 60% in the same pairing.

Non-residential districts print their caps on structures and on structures, driveways and parking. District O-P (§ 160.032(D)) and District D (§ 160.033(D)) allow 40% for structures and 90% including driveways and parking. District C (multi-family) allows 50% for structures and 70% for driveways and parking. District E-1, Central Business, prints 100% for both.

The Building Official enforces the numbers at permit time. Under § 160.111 an applicant must file a plan in duplicate, drawn to scale, showing the dimensions of the lot and the location and dimensions of the building on the lot with measurements from all lot lines, and no permit issues unless the plan shows conformity with chapter 160.

Violations & Fines

Section 10.99 sets a fine not exceeding $2,000 for zoning violations where no specific penalty is provided, and each day a violation continues is a separate offense. Under § 160.109 the Building Official can order remedies in writing and institute action to restrain, correct or abate construction that violates chapter 160. Under § 160.111 a permit is void, and can be revoked by written notice, when work departs from the approved plan.

Frequently Asked Questions

How does Texas City measure lot coverage?
Section 160.006 defines lot coverage as the percentage of the total area of a lot occupied by the base (first story or floor) of buildings located on the lot. A second floor does not add to the figure. The percentage is then compared with the maximum printed in the district's area and height table.
What is the lot coverage limit for a single-family home in District A?
Section 160.024(D) sets maximum lot coverage by the principal structure at 40% in District A. The same table sets a 6,000 square foot minimum lot area per dwelling unit, a 25 foot minimum front yard, a 20 foot minimum rear yard and a 5 foot minimum side yard, with 15 feet on the street side of a corner lot.
Does Texas City limit driveways and parking too?
In some districts. District A-2 patio homes cap structures, driveways and parking at 60%, the office and neighborhood service districts at 90%, and District C multi-family at 70% for driveways and parking. The District A and A-1 tables print only the principal structure figure of 40%.
Who checks lot coverage before I build?
The Building Official. Under § 160.111 no permit issues unless the applicant files a plan in duplicate, drawn to scale, showing the lot dimensions and the location and dimensions of the building, with measurements in feet and inches from all lot lines. The plan must show conformity with chapter 160.

Sources & Official References

Other rules in Texas City

All Texas City rules

Texas rules heatmap·Compare Texas City to another location·View the Texas building setbacks & zoning overview

Get notified when Lot Coverage Limits in Texas City, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.