Texas City, TX Building Setbacks & Zoning: Setback Rules (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

District A yards
25 feet front, 20 feet rear, 5 feet side
District A-1 front yard
30 feet
Corner lot, street side
15 feet in Districts A, A-1, A-2 and B
Pipeline easement setback
25 feet in residential districts
Space between buildings
10 feet minimum
Fine
$10 to $2,000, each day a separate offense

Summary

Texas City, Texas sets yard minimums district by district. District A requires a 25 foot front yard, a 20 foot rear yard and a 5 foot side yard, with 15 feet on the street side of a corner lot. District A-1 requires 30 feet in front, and § 160.091(H) adds a 25 foot setback from high-pressure gas pipeline easements.

(D) Area and height requirements. ... Minimum front yard 25 feet ... Minimum ... rear yard 20 feet Minimum side yard Minimum of 5 feet Minimum side yard corner lot 15 feet on street side ... (H) To provide adequate protection in all districts zoned for residential uses, a minimum setback of 25 feet of all buildings and accessory buildings from any underground, high-pressure, gas pipeline easement or any other hazardous pipeline is required. When deemed necessary, the City Commission may request additional setbacks. The only exception will be one storage building not exceeding 225 square feet in floor area or 12 feet in height will be allowed in the 25-foot setback area. Foundations for storage buildings will be constructed on a treated wood foundation and not on concrete. Storage buildings are not classified as permanent accessory buildings.

Full Breakdown

Yard setbacks in Texas City, Texas are printed in the area table of each zoning district in Chapter 160, and § 160.091 adds exceptions that apply across districts. District A under § 160.024(D) requires a minimum front yard of 25 feet, a minimum rear yard of 20 feet, a minimum side yard of 5 feet and 15 feet on the street side of a corner lot. District A-1 under § 160.025(D) raises the front yard to 30 feet and keeps 20 feet, 5 feet and 15 feet for the rear, side and corner street side. District A-2, Patio Homes, requires 15 feet in front, or 20 feet where the garage faces the street, and 10 feet at the rear for 1 story or 15 feet for 2 stories. District B requires 30 feet in front, 20 feet at the rear and 6 feet at the side. District C-1 requires 25 feet in front, 20 feet at the rear and 20 feet at the side. District O, Open Space, requires a 50 foot front yard, a 20 foot rear yard, a 15 foot side yard and 25 feet where adjacent to a street.

Section 160.091 sets the shared exceptions. Where a street frontage is partly built with front yards that do not conform, or the ground configuration makes conformity a hardship, the Board of Adjustment permits modifications of the front yard requirements for the remaining frontage (subsection A). A minimum of ten feet is allowed between buildings, and eaves, roofs or other projections cannot reduce it by more than 40% (subsection E). Yards stay open to the sky except for listed projections: window sills, belt courses and cornices not exceeding four inches, chimneys not more than two feet, and balconies and one-story porches with three unenclosed sides projecting into a front or rear yard not to exceed ten feet (subsection F). An open fire escape projects not more than four feet into a side or rear yard (subsection G).

Subsection (H) applies in all districts zoned for residential uses. Buildings and accessory buildings sit at least 25 feet from any underground, high-pressure gas pipeline easement or other hazardous pipeline, and the City Commission requests additional setbacks when deemed necessary. Accessory buildings also stay five feet from any rear lot line under § 160.083(D).

Violations & Fines

Under § 160.999, a person or corporation violating or failing to comply with Chapter 160 is fined, upon conviction, not less than $10 nor more than $2,000, and each day the violation or non-compliance continues is a separate offense. A house or addition built inside the 25 foot District A front yard, or a building inside the 25 foot pipeline setback, is a continuing violation.

Frequently Asked Questions

What is the front setback in District A?
Section 160.024(D) prints a minimum front yard of 25 feet in District A. District A-1 requires 30 feet, District B requires 30 feet, and District O requires 50 feet. District A-2 requires 15 feet, or 20 feet where the garage faces the street. Each district table is the controlling figure for its own zone.
How far must a building sit from a gas pipeline?
Section 160.091(H) requires a minimum setback of 25 feet for all buildings and accessory buildings from any underground, high-pressure gas pipeline easement or other hazardous pipeline in districts zoned for residential uses. The City Commission requests additional setbacks when deemed necessary.
Can a porch extend into the front yard?
Balconies and one-story porches with three unenclosed sides project into a front or rear yard not to exceed ten feet under § 160.091(F). Window sills, belt courses and cornices are limited to four inches and chimneys to two feet, and yards otherwise stay open to the sky, unobstructed.
Who grants a front yard modification?
The Board of Adjustment permits modifications of front yard requirements under § 160.091(A) and (B). Section 160.110 establishes the Board with five members, each appointed by the City Commission for a term of two years.

Sources & Official References

Other rules in Texas City

All Texas City rules

Texas rules heatmap·Compare Texas City to another location·View the Texas building setbacks & zoning overview

Get notified when Setback Rules in Texas City, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.