4 verified environmental rules for Asheville, North Carolina, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Asheville requires a grading and stormwater permit before any land-disturbing development or redevelopment can begin, enforced by the city's stormwater administrator under Sec. 7-12-2. Illicit discharges to the storm drain system are banned outright, and violators face civil penalties running as high as $25,000.

Asheville Stormwater and Sediment Control Rules

Significant Restrictions

Asheville, NC Code of Ordinances Sec. 7-12-2(i)(1)-(2)

(1) Civil penalty for soil erosion and sedimentation violations: ... The maximum civil penalty for a violation is $5,000.00. A civil penalty may be assessed from the date of the violation. Each day of a continuing violation shall constitute a separate violation. (2) Civil penalty for stormwater control, illicit discharge and connection violations: ... The maximum civil penalty for a violation i...

Erosion Control

Asheville requires a grading permit and an approved erosion control plan before any land-disturbing activity begins, under Sec. 7-5-13. Disturbances over 10,000 square feet need a formal plan; smaller ones need only a sketch plan. City erosion and sedimentation control staff reviews every plan, forwards formal ones to the Buncombe County Soil and Water Conservation District, and violators face a $100-per-day civil penalty.

Asheville Erosion & Sediment Control Permit

Some Restrictions

Asheville City Code Sec. 7-5-13(a), (c)(3)

(a) Purpose. To assure that land-disturbing activity undertaken in the city does not result in accelerated erosion and sedimentation, no such land-disturbing activity shall take place until plans for controlling erosion associated with the activity have been reviewed and approved in accordance with the procedures set forth below. ... (3) Plan required. All applications for a grading permit ...

Flood Zones

No structure or land in an Asheville special flood hazard area may be built, altered, or developed without a floodplain development permit from the public works director, who serves as floodplain administrator. Violations carry a civil penalty of up to $25,000, assessed per day for continuing violations.

Flood Zone Development Rules in Asheville

Significant Restrictions

Asheville City Code Sec. 7-12-1(b)(4), (h)(1), (i)(1)

(4) Compliance: No structure or land shall hereafter be located, extended, converted, altered, or developed in any way without full compliance with the terms of this section and other applicable regulations. ... (1) General violations: It shall constitute a violation of this section for any person to fail to obtain a permit prior to any development located in special flood hazard areas, fail to...

Flood Elevation Requirements

New construction and substantial improvements in Asheville's mapped flood hazard areas must be built at least two feet above the base flood elevation. City Code Section 7-12-1(e)(1)(o) sets that two-foot freeboard as the city's Regulatory Flood Protection Elevation, and residential structures must have their lowest floor, including any basement, built no lower than that elevation.

Asheville Flood Elevation Freeboard Rule

Some Restrictions

Asheville City Code Section 7-12-1(e)(1)(o), (e)(2)(a)

o. The Regulatory Flood Protection Elevation ("RFPE"), where Base Flood Elevations (BFEs) have been determined, shall be the BFE plus the freeboard of two (2) feet. In "Special Flood Hazard Areas" where no BFE has been established, the RFPE this elevation shall be at least two (2) feet above the highest adjacent grade. ... a. Residential construction. New construction and substantial improv...