Stormwater Management

In the City of Bozeman, Montana, every new development and redevelopment project must submit a stormwater management plan or, above five acres, a comprehensive drainage plan to the city engineering department for approval. No final plat, final site plan or building permit issues without an approved plan.

Bozeman Stormwater Management Plan Requirements

Some Restrictions

Bozeman Municipal Code § 40.04.700

A.To control the quality, volume and rate of stormwater runoff to storm drains and prevent the deterioration of water quality, all new developments and redevelopment projects will be required to submit a stormwater management plan or a comprehensive drainage plan to the city engineering department for approval. ... 1.A comprehensive drainage plan is required for all development larger than five...

Erosion Control

In the City of Bozeman, Montana, owners and operators of construction sites must stabilize disturbed soil and stockpiles, install sediment controls, and inspect all BMPs at least every 14 calendar days and within 24 hours after major storms. Temporary erosion devices come off only at 70 percent permanent ground cover.

Bozeman Construction Erosion and Sediment Control Rules

Some Restrictions

Bozeman Municipal Code § 40.04.360

A.Erosion control. Owner/operator shall:1.Stabilize disturbed soil using recommended methods described in the city's Stormwater Master Plan;2.Stabilize or cover soil stockpiles to prevent sediment runoff or blowing of dust or sediment from the site;3.Prevent upland runoff that may erode disturbed slopes.B.Sediment control. Owner/operator shall:1.Provide sediment controls in the form of settling...