Environmental Rules in Burlington, WI (2026)
5 verified environmental rules for Burlington, Wisconsin, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Burlington requires a stormwater management permit from the City Engineer before any land development or redevelopment disturbing one acre or more can begin. Applicants must submit a stormwater management plan, maintenance agreement and financial guarantee, and violators face a forfeiture of up to $500 per day.
Burlington Stormwater Management Permit
Significant RestrictionsBurlington City Code § 270-8A; § 270-13I
Permit required. No landowner or land operator may undertake a land development or land redevelopment activity subject to this chapter without receiving a permit from the City prior to commencing the proposed activity. ... Any person, firm, association, or corporation ... who or which does not comply with the provisions of this chapter shall be subject to a forfeiture of $500 per day for each d...
Erosion Control
Burlington requires a City Engineer-issued permit and an approved erosion and sediment control plan before any land-disturbing construction activity begins. Chapter 148 sets design standards, inspection schedules, and a forfeiture of $10 to $500 per day for violations of its erosion-control requirements.
Burlington Construction Site Erosion Control
Some RestrictionsBurlington City Code § 148-9
A. Permit required. No responsible party may commence a land-disturbing construction activity subject to this chapter without receiving prior approval of an erosion and sediment control plan for the site and a permit from the City Engineer. ... B. Permit application and fees. At least one responsible party desiring to undertake a land-disturbing construction activity subject to this chapter sha...
Flood Zones
Burlington's Floodplain Zoning Ordinance divides regional floodplain land along the Fox River into Floodway, Floodfringe Overlay and General Floodplain Districts. Development must meet permit and elevation standards administered by the Zoning Administrator, and violators face a forfeiture of $10 to $50 per day plus court costs.
Burlington Floodplain Zoning Rules
Significant RestrictionsBurlington City Code § 119-36; § 119-5C(1)
§ 119-36. Enforcement and penalties. Any violation of the provisions of this chapter by any person shall be unlawful and shall be referred to the Municipal Attorney, who shall expeditiously prosecute all such violators. A violator shall, upon conviction, forfeit to the municipality a penalty of not less than $10 and not more than $50, together with a taxable cost of such action. Each day of con...
Boat Dock Permits
In shoreland areas along Burlington's waterways, City Code § 315-12.1.B(2) exempts piers, boat hoists and boathouses from the standard 75-foot shore setback, while § 315-12.1.C caps accessory boathouses at 15 feet high, 250 square feet, and no closer than 20 feet to the high-water line.
Burlington Shoreland Pier And Boathouse Rules
Some RestrictionsBurlington City Code § 315-12.1.B(2), C(1)(a), (c), (d)
Unless an existing development pattern exists, a setback of 75 feet from the ordinary high-water mark of an adjacent body of water to the nearest part of a building or structure shall be required for all buildings and structures except piers, boat hoists, and boathouses. ... Boathouses located within shoreland areas ... shall be regulated as follows: ... Boathouses accessory to residential uses...
Flood Elevation Requirements
Burlington requires new construction in the floodfringe to sit at or above the flood-protection elevation, defined as two feet of freeboard above the regional flood level. New homes must be built on fill extending at least fifteen feet beyond the structure, under Chapter 119, the City's floodplain zoning ordinance.
Burlington Flood Elevation Freeboard Rule
Some RestrictionsBurlington City Code §§ 119-18, 119-37
C. Residential uses. Any structure, including a manufactured home, which is to be newly constructed or moved into the floodfringe shall meet or exceed the following standards. Any existing structure in the floodfringe must meet the requirements of Article VI, Nonconforming Uses. (1) The elevation of the lowest floor shall be at or above the flood-protection elevation on fill unless the requirem...
Looking for Racine County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Burlington city rules.
Environmental Rules in Racine County →