Environmental Rules in Lansing, MI (2026)
4 verified environmental rules for Lansing, Michigan, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Lansing requires an approved post-construction stormwater management plan for site plans, plot plans, plats and grading applications, and for public projects disturbing one acre or more, under Lansing Codified Ordinances § 1219.03.
Lansing Post-Construction Stormwater Rules
Some RestrictionsLansing Codified Ordinances § 1219.03(a)
This chapter shall be applicable to all land development (new development and redevelopment), including but not limited to, site plan, plot plan and plat applications as well as any grading applications. In addition, this chapter shall be applicable to public improvement projects that disturb one acre or more. The City Engineer may waive the channel protection requirements, water quality requi...
Erosion Control
Lansing requires a Soil Erosion and Sedimentation Control (SESC) permit from the City Engineer before any earth change disturbing one acre or more, or within 500 feet of a lake or stream, under Lansing Codified Ordinances § 1218.06.
Lansing Soil Erosion Control Permit
Some RestrictionsLansing Codified Ordinances § 1218.06
Except as otherwise provided in this chapter, a land owner or designated agent, who contracts for, allows or engages in any earth changes which disturbs one or more acres of land, or which is within 500 feet of a lake or stream, shall obtain a SESC permit issued by the City Engineer prior to the commencement of such earth changes. The SESC permit shall be issued to the landowner, as defined in ...
Flood Zones
Lansing requires new construction and substantial improvements inside the FEMA-mapped special flood hazard area to elevate the lowest floor, basement included, at least one foot above the base flood elevation, and it bans encroachments and new development inside the regulatory floodway outright. A special permit from the Planning Office is required for any floodplain use on a parcel of a half-acre or more, under City Codified Ordinances § 1250.06.
Lansing Floodplain Development Standards
Significant RestrictionsLansing Codified Ordinances § 1250.06(a), (d)(1)a., (f)
(a)Intent. It is the intent of this ordinance to protect human life, health, and property from flood conditions, to preserve the ability of floodplains to carry and discharge a base flood, and to significantly reduce potential hazards as a result of flood conditions within the City of Lansing... (d)Specific base flood elevation standards.(1)a.All new construction and substantial improvements of...
Flood Elevation Requirements
Lansing requires new construction and substantial improvements in the special flood hazard area to elevate the lowest floor at least one foot above the base flood elevation, exceeding the bare NFIP minimum.
Lansing Base Flood Elevation Freeboard
Some RestrictionsLansing Codified Ordinances § 1250.06(d)(1)a.
(d)Specific base flood elevation standards.(1)On the basis of the most recent available base flood elevation data the following standards shall apply in the area of special flood hazard:a.All new construction and substantial improvements of residential structures shall have the lowest floor, including basement, elevated to a minimum of one foot above the base flood level.b.All new construction ...