Lansing, MI Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Minimum freeboard
- 1 foot above base flood elevation
- Applies to
- special flood hazard area
- Special permit trigger
- parcels of 0.5+ acre
- Certification by
- registered engineer or architect
Summary
Lansing requires new construction and substantial improvements in the special flood hazard area to elevate the lowest floor at least one foot above the base flood elevation, exceeding the bare NFIP minimum.
(d)Specific base flood elevation standards.(1)On the basis of the most recent available base flood elevation data the following standards shall apply in the area of special flood hazard:a.All new construction and substantial improvements of residential structures shall have the lowest floor, including basement, elevated to a minimum of one foot above the base flood level.b.All new construction and substantial improvements of structures shall have either:1.The lowest floor, including basement, elevated to a minimum of one foot above the base flood elevation; or2.Be constructed such that below base flood elevation, together with attendant utility and sanitary facilities:i.The structure is watertight, with walls impermeable to the passage of water; andii.Is constructed with structural components having the ability to neutralize hydrostatic and hydrodynamic loads; andiii.The effects of buoyancy must be resisted. A registered professional engineer or architect shall certify that the standards of this subparagraph are satisfied, and that the flood proofing methods employed are adequate to withstand the flood depth, pressures, velocities, impact and uplift forces and other factors associated with a base flood in the location of the structure. Such certification shall be submitted to the Building Safety Office, and shall indicate the elevation to which the structure is flood proofed.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 64).
Full Breakdown
Lansing's floodplain ordinance implements the National Flood Insurance Program citywide. In the area of special flood hazard, new construction and substantial improvements to residential structures must have their lowest floor, including any basement, elevated at least one foot above the base flood elevation, the 100-year flood level. Other structures may meet the same freeboard or be flood-proofed and certified watertight by a registered engineer or architect, with certification filed with the Building Safety Office. Floodplain use on a parcel of one-half acre or larger also needs a special permit from the Planning Office before City Council acts.
Violations & Fines
Building without the required elevation or flood-proofing certification blocks Building Safety Office approval; using a floodplain parcel of one-half acre or more without the special permit required by Section 1250.06(f) is itself prohibited.
Frequently Asked Questions
How much freeboard does Lansing require above base flood elevation?
Who reviews Lansing floodplain construction?
Sources & Official References
Other rules in Lansing
Compare Lansing to another location·View the Michigan environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.