Environmental Rules in Michigan (2026)
73 rules on the books across Michigan, 20 cities and counties. Select a rule to read the full details.
Severity: Few Restrictions · Light Restrictions · Some Restrictions · Significant Restrictions · Heavy Restrictions
Stormwater Management
Requirements for managing rainwater runoff on your property, including retention basins, permeable surfaces, and drainage plans.
Michigan: statewide
StatewideHeavy RestrictionsMichigan administers federal stormwater rules under Part 31 of NREPA, requiring statewide MS4 and construction permits…
Read full rule →Dearborn
Significant RestrictionsDearborn bans dumping anything but storm water into its storm drain system and requires industrial and construction…
Read full rule →Flint
Significant RestrictionsThe City of Flint bans any discharge to its storm sewer system that is not entirely storm water, requiring an NPDES…
Read full rule →Livonia
Significant RestrictionsLivonia requires a stormwater construction approval and construction permit, coordinated with Wayne County, before…
Read full rule →Sterling Heights
Significant RestrictionsSterling Heights bans discharging anything but storm water into its municipal storm drain system and watercourses…
Read full rule →Wyoming
Significant RestrictionsWyoming, Michigan requires stormwater review and approval before any development begins, under the city's Chapter 68…
Read full rule →Clinton Township
Some RestrictionsClinton Township's Drainage chapter bars connecting roof downspouts, footing drains or other surface runoff to the…
Read full rule →Detroit
Some RestrictionsDetroit requires a Water and Sewerage Department-approved Post-Construction Stormwater Management Plan before site plan…
Read full rule →Farmington Hills
Some RestrictionsFarmington Hills bans discharging anything but stormwater into its municipal storm drain system under the city's…
Read full rule →Grand Rapids
Some RestrictionsGrand Rapids bans discharging anything but stormwater into its City Stormwater Drainage System, requiring dischargers…
Read full rule →Lansing
Some RestrictionsLansing requires an approved post-construction stormwater management plan for site plans, plot plans, plats and grading…
Read full rule →Shelby Village
Some RestrictionsShelby's groundwater protection article requires any site plan for a business handling more than 100 kilograms of…
Read full rule →Troy
Some RestrictionsTroy requires every development project subject to site plan review to use best management practices meeting the city's…
Read full rule →Warren
Some RestrictionsNew development or redevelopment disturbing one acre or more in Warren must control post-construction stormwater runoff…
Read full rule →Wayne County
Some RestrictionsWayne County requires a stormwater construction approval and construction permit before any regulated construction…
Read full rule →Westland
Some RestrictionsWestland requires a stormwater construction approval before any regulated construction activity affecting roads, city…
Read full rule →Erosion Control
Rules to prevent soil erosion during construction and landscaping, including required sediment barriers and ground cover standards.
Michigan: statewide
StatewideSome RestrictionsMichigan's Part 91 of NREPA imposes uniform statewide soil erosion permits for earth changes near water or disturbing…
Read full rule →Oakland County
Heavy RestrictionsAny earth change of 1 acre or more, or any earth change within 500 feet of a lake, stream, wetland, or county drain in…
Read full rule →Bay County
Significant RestrictionsBay County requires a Soil Erosion and Sediment Control Permit before any earth change disturbing enough ground to…
Read full rule →Wyoming
Significant RestrictionsAnyone who causes an earth change in Wyoming, Michigan must control soil erosion and sedimentation well enough to keep…
Read full rule →Clinton Township
Some RestrictionsClinton Township requires every site-improvement plan to include adequate soil erosion and sedimentation control…
Read full rule →Dearborn
Some RestrictionsDearborn requires an SESC permit from the building official for any earth change of one acre or more, or within 500…
Read full rule →Detroit
Some RestrictionsDetroit property owners must grade lots to prevent soil erosion and stop stagnant water from pooling on the ground or…
Read full rule →Farmington Hills
Some RestrictionsFarmington Hills requires soil erosion and sediment control devices on every site under construction, per the…
Read full rule →Grand Rapids
Some RestrictionsGrand Rapids requires a Stormwater Discharge Permit before any earth change of 2,500 square feet or more, or any…
Read full rule →Kent County
Some RestrictionsKent County requires a Soil Erosion and Sedimentation Control (SESC) permit before any earth change that disturbs one…
Read full rule →Lansing
Some RestrictionsLansing requires a Soil Erosion and Sedimentation Control (SESC) permit from the City Engineer before any earth change…
Read full rule →Livonia
Some RestrictionsAnyone proposing an earth change within 500 feet of a lake or stream, or disturbing an acre or more of land in Livonia…
Read full rule →Ottawa County
Some RestrictionsAny earth change in Ottawa County that disturbs one acre or more, or sits within 500 feet of a lake or stream, needs a…
Read full rule →Sterling Heights
Some RestrictionsSterling Heights requires a Soil Erosion and Sedimentation Control permit from the Office of Engineering before any…
Read full rule →Troy
Some RestrictionsTroy requires a Soil Erosion and Sedimentation Control (SESC) permit for any earth change disturbing more than one…
Read full rule →Warren
Some RestrictionsWarren requires a city engineer permit before anyone disturbs soil in a way that changes drainage patterns, and once…
Read full rule →Wayne County
Some RestrictionsWayne County requires a stormwater construction approval and construction permit before any grading, clearing, or…
Read full rule →Westland
Some RestrictionsWestland requires an approved grading plan before it issues a building permit, plus a paid grading certificate before…
Read full rule →Flint
Light RestrictionsBefore the City of Flint issues a building permit for most new development, the site plan must show drainage patterns…
Read full rule →Coastal Development
Building restrictions near coastlines, including setbacks from the water, dune protection rules, and coastal commission permits.
Flood Zones
Building requirements for properties in FEMA flood zones, including elevation standards, flood insurance mandates, and construction limits.
Michigan: statewide
StatewideHeavy RestrictionsMichigan requires EGLE permits for occupation, filling, or construction within the 100-year floodplain of any river or…
Read full rule →Bay County
Significant RestrictionsBay County's Health Department will not permit a new on-site sewage disposal system (septic system) if its proposed…
Read full rule →Clinton Township
Significant RestrictionsClinton Township requires a development permit before anyone locates a structure or obstruction, or makes substantial…
Read full rule →Flint
Significant RestrictionsThe City of Flint requires a development permit before any construction, fill, grading or excavation in an area of…
Read full rule →Grand Rapids
Significant RestrictionsGrand Rapids regulates construction in FEMA-mapped floodplains along the Grand River, adopting the current Flood…
Read full rule →Lansing
Significant RestrictionsLansing requires new construction and substantial improvements inside the FEMA-mapped special flood hazard area to…
Read full rule →Livonia
Significant RestrictionsLivonia bars new buildings and most land uses inside its mapped Special Flood Hazard Area under Section 8.06 of the…
Read full rule →Shelby Village
Significant RestrictionsThe Village of Shelby's subdivision ordinance forbids platting land subject to flooding for residential use. Under…
Read full rule →Sterling Heights
Significant RestrictionsSterling Heights bars human habitation inside its FEMA-mapped floodplain area under Zoning Ordinance Article 16 and…
Read full rule →Warren
Significant RestrictionsWarren participates in FEMA's National Flood Insurance Program, and § 9-21 blocks the code official from issuing a…
Read full rule →Wyoming
Significant RestrictionsWyoming, Michigan (Kent County) bans new residences, landfills, junkyards and sewage-disposal systems outright in…
Read full rule →Dearborn
Some RestrictionsAny new construction, substantial improvement, or land alteration inside a Dearborn area of special flood hazard…
Read full rule →Detroit
Some RestrictionsDetroit requires a floodplain development permit from the Buildings, Safety Engineering, and Environmental Department…
Read full rule →Farmington Hills
Some RestrictionsFarmington Hills regulates floodprone land by adopting FEMA's 2006 Oakland County Flood Insurance Study and its Flood…
Read full rule →Ottawa County
Some RestrictionsOttawa County's Environmental Health Division will not approve a septic system for a new or rebuilt home sited inside…
Read full rule →Troy
Some RestrictionsTroy requires a floodplain development permit before any grading, filling, building or other development inside an area…
Read full rule →Westland
Some RestrictionsWestland enforces FEMA flood insurance maps and the state Building Code's flood-hazard provisions citywide, with the…
Read full rule →Boat Dock Permits
Permits required to build or modify boat docks, lifts, and davits on waterfront properties, including size limits, setbacks, and environmental reviews.
Vehicle Idling Restrictions
Limits on how long heavy-duty vehicles, buses, and passenger cars may idle, including bans near schools and residential areas.
Ann Arbor
Some RestrictionsAnn Arbor bans commercial vehicles from idling at all while unoccupied and caps idling at 5 minutes per 60-minute…
Read full rule →Dearborn
Some RestrictionsDearborn caps vehicle idling at 5 minutes per hour for occupied vehicles and bans idling entirely for unoccupied ones…
Read full rule →Detroit
Some RestrictionsHeavy commercial vehicles over 8,500 lbs GVWR can't idle more than 5 minutes per hour in Detroit, with civil fines up…
Read full rule →Farmington Hills
Some RestrictionsFarmington Hills bars a parked or standing commercial truck or tractor-trailer from running its engine audibly on…
Read full rule →Grand Rapids
Some RestrictionsGrand Rapids prohibits idling a motor vehicle over five tons for more than two minutes while stationary within 150 feet…
Read full rule →Livonia
Some RestrictionsLivonia bars trucks and other vehicles over 10,000 pounds from idling more than five minutes an hour overnight within…
Read full rule →Flood Elevation Requirements
FEMA NFIP minimum base flood elevation (BFE) construction standards for properties in mapped flood zones, including freeboard requirements above BFE.
Flint
Significant RestrictionsThe City of Flint requires new and substantially improved residential structures in flood hazard areas to have the…
Read full rule →Clinton Township
Some RestrictionsNew construction and substantial improvements in Clinton Township's flood hazard areas must have the lowest floor…
Read full rule →Dearborn
Some RestrictionsNew construction or substantial improvement of a residential structure in a Dearborn flood hazard area must have its…
Read full rule →Detroit
Some RestrictionsDetroit requires new construction and substantial improvements in flood hazard areas to elevate the lowest floor…
Read full rule →Farmington Hills
Some RestrictionsFarmington Hills requires one foot of freeboard above the 100-year stormwater elevation in every detention and…
Read full rule →Grand Rapids
Some RestrictionsGrand Rapids bars new construction in flood-prone drainage areas from having a building opening below the Flood…
Read full rule →Lansing
Some RestrictionsLansing requires new construction and substantial improvements in the special flood hazard area to elevate the lowest…
Read full rule →Livonia
Some RestrictionsNew construction above Livonia's mapped flood level still must clear a specific elevation test: Section 8.06(2)(B) of…
Read full rule →Ottawa County
Some RestrictionsIn Ottawa County flood-affected areas, well caps must sit at least 12 inches above the 100-year floodplain elevation…
Read full rule →Sterling Heights
Some RestrictionsIn Sterling Heights, Michigan floodplain areas, a home's lowest floor must sit at least two feet above the FEMA…
Read full rule →Troy
Some RestrictionsAny new residential structure or substantial improvement inside a Troy flood hazard area must have its lowest floor…
Read full rule →Warren
Some RestrictionsWarren doesn't print its own freeboard figure; it enforces elevation standards through the adopted Michigan Building…
Read full rule →Wyoming
Some RestrictionsWyoming, Michigan requires the lowest floor of new and substantially improved buildings in the floodplain, including…
Read full rule →