Warren, MI Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit authority
City engineer
Filing fee
$50, nonrefundable
Topsoil retention
Top 6 inches set aside, respread
Permit term
1 year, extendable
Bond
$500-$5,000+, scaled to acreage
Penalty
$100-$1,000 civil infraction

Summary

Warren requires a city engineer permit before anyone disturbs soil in a way that changes drainage patterns, and once removal or regrading is approved, the work must be graded to approved contours with no sharp declivities, pits, or depressions left behind.

Sec. 32-26. - Required. A person shall not add, remove, deposit, regrade, or otherwise disturb soil on a parcel of real property that impedes, inhibits, or significantly changes the preexisting water drainage pattern or system without written permission from the city engineer. ... Sec. 32-3. - Conduct of operations. If permission to remove, dump or regrade soil shall be granted, the owner or person in charge shall so conduct the operations that there shall be no sharp declivities, pits or depressions, and in such a manner that the area shall be properly leveled off, cleared of debris, and graded to conform with the contour lines and grades as approved by the division of engineering.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 102).

Full Breakdown

). Sec. 32-26 requires written permission from the city engineer before anyone adds, removes, deposits, regrades, or otherwise disturbs soil in a way that impedes, inhibits, or significantly changes the preexisting drainage pattern. Once permission is granted, Sec. 32-3 requires the operation to leave the site with no sharp declivities, pits, or depressions, properly leveled, cleared of debris, and graded to the contour lines and grades the division of engineering approved. Sec. 32-4 requires the top six inches of arable soil to be set aside and respread over the site once the rest of the soil has been removed, and Sec.

32-5 bars removing soil below the established street grade except for an approved building project with a permit and signed construction contract. The permit application under Sec. 32-27 requires a $50 nonrefundable filing fee and a map showing existing and proposed contour grades; the director of public service, per Sec. 32-28, must weigh whether the work would create a nuisance, deplete natural resources, or endanger public health or safety before approving it. Sec. 32-29 lets the director deny a permit if the work would cause soil erosion, fertility problems, or drainage or sewerage issues, and any approval is valid for only one year unless extended.

Before work starts, Sec. 32-30 requires a bond scaled to acreage, $500 for under one acre up to $5,000 plus $1,000 per acre over five acres, that the city can forfeit if trucks track dirt onto adjacent streets, grading isn't kept level during hauling, or approved grade levels aren't maintained and certified by a civil engineer at completion.

Violations & Fines

Violating any provision of chapter 32 is a municipal civil infraction under Sec. 32-32(a), carrying a fine of $100 to $1,000 per violation plus costs and other sanctions. If the city engineer finds the drainage pattern was altered, Sec. 32-32(b) lets the engineer order the property owner, at the owner's own expense, to make the necessary alterations to restore adequate drainage.

Frequently Asked Questions

Do I need a permit to regrade or remove soil in Warren, Michigan?
Yes, if the work changes drainage. Sec. 32-26 requires written permission from the city engineer before adding, removing, depositing, or regrading soil in a way that impedes or significantly changes the preexisting drainage pattern on the parcel.
What erosion standards apply once a Warren soil permit is issued?
Sec. 32-3 requires the site to end up with no sharp declivities, pits, or depressions, properly leveled, cleared of debris, and graded to the contour lines the division of engineering already approved.
What bond does a Warren grading project need?
Sec. 32-30 scales the bond to acreage: $500 for under one acre, $1,000 per acre from one to five acres, and $5,000 plus $1,000 per acre above five acres, forfeitable if the contractor fails to fix tracked-out dirt or grading violations within seven days of notice.

Sources & Official References

Other rules in Warren

All Warren rules

Compare Warren to another location·View the Michigan environmental rules overview

Get notified when Erosion Control in Warren, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Macomb County handle erosion control.

Sterling Heights, MI
Some Restrictions