Warren, MI Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Elevation standard source
- Michigan Building Code Appendix G
- Local enforcement
- Code official under § 9-20
- Required record
- Lowest floor elevation certificate
- Who certifies
- Buildings & safety engineering division
- City engineer role
- Verifies elevation vs. mean sea level
Summary
Warren doesn't print its own freeboard figure; it enforces elevation standards through the adopted Michigan Building Code's Appendix G on flood-resistant construction, and § 9-23 requires the buildings division to keep a flood-proofing certificate documenting each floodplain structure's lowest floor elevation.
The division of buildings and safety engineering shall maintain records of any issued certificates of flood proofing for new structures and substantially improved structures. Those certificates shall include the following minimum information as applicable to the particular building: lowest floor elevation, existence of a basement, method of flood proofing, and elevation to which the structure has been flood proofed.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 102).
Full Breakdown
Because Warren adopted the State Construction Code wholesale at § 9-16, its own floodplain rules don't restate a separate numeric freeboard figure; instead § 9-20 designates the code official as the official authorized to administer and enforce the State Construction Code as adopted, including the provisions of Appendix G of the Michigan Building Code entitled Flood-Resistant Construction, which is where the actual elevation and flood-proofing engineering standards live. On the recordkeeping side, § 9-23 requires the division of buildings and safety engineering to maintain records of any issued certificates of flood proofing for new structures and substantially improved structures, and those certificates must include, as applicable, the lowest floor elevation, whether there is a basement, the method of flood proofing, and the elevation to which the structure has been flood proofed.
The city engineer separately verifies and records the actual elevation of all structures constructed in the floodplain in relation to mean sea level of the lowest floor, including basement, under § 9-24. In practice, an applicant building in a mapped flood hazard area must document the structure's lowest floor elevation against Appendix G's requirements as part of getting a floodplain and building permit, and that documentation becomes part of the city's permanent floodplain construction file, open to public inspection.
Violations & Fines
There is no elevation-specific fine listed separately; failing to meet Appendix G's flood-resistant construction and elevation-certification requirements is enforced the same way as any other building-code violation, through the code official's permit and inspection authority and, ultimately, the general municipal penalty of up to $500 and 90 days in jail, or a $100 to $1,000 civil infraction, under § 1-8.
Frequently Asked Questions
Does Warren require a specific freeboard height above base flood elevation?
What records does Warren keep on flood elevation?
Who checks the elevation of a new structure in the floodplain?
Sources & Official References
Other rules in Warren
Compare Warren to another location·View the Michigan environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Macomb County handle flood elevation requirements.