Southfield, MI Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 5.49(6)(b)(1)
Freeboard requirement
3 feet above floodplain elevation
Applies to
Lowest floor, including basements
Recordkeeping duty
City engineer records elevation vs. mean sea level
Barred uses in fringe
Hospitals, nursing homes, schools, toxic storage

Summary

In Southfield's Floodplain Fringe District, City Code § 5.49(6)(b)(1) requires new construction or substantial improvements to set the lowest floor, including any basement, at least three feet above the floodplain elevation. The city engineer records the actual elevation of the lowest habitable floor on every new or substantially improved structure, in relation to mean sea level, whether or not it has a basement.

1.For new construction or substantial improvement, the elevation of the lowest floor designed or intended for human habitation and/or employment (including basement) shall be at least three (3) feet (0.915 meters) above the elevation of the floodplain. ... 9.The city engineer shall obtain and record the actual elevation (in relation to mean sea level) of the lowest habitable floor (including basements and cellars and any openings thereto) of all new or substantially improved structures and whether or not the structure contains a basement or cellar.

Full Breakdown

Southfield's freeboard standard sits inside the Floodplain Fringe District rules of § 5.49(6)(b), the zone where ordinary development is allowed but only under added flood-resistance conditions. Paragraph 1 sets the core elevation rule: the lowest floor designed or intended for human habitation or employment, including a basement, must be at least three feet above the elevation of the floodplain. That elevation requirement pairs with several companion standards in the same subsection. Any filling of the floodplain fringe needs erosion controls approved by the city engineer so soil does not wash into the regulatory floodplain or channel, and dumping or backfilling is otherwise prohibited unless compensating excavation keeps the fringe's flood-carrying capacity intact.

Substantial improvements must be designed and anchored against flotation, collapse, or lateral movement, built with flood-damage-resistant materials, and constructed using methods that minimize flood damage; water supply and sanitary sewage systems serving the property must be designed to minimize infiltration by floodwater and to avoid discharging into it. Paragraph 9 puts a recordkeeping duty on the city itself: the city engineer must obtain and record the actual elevation, relative to mean sea level, of the lowest habitable floor, including basements and cellars, of every new or substantially improved structure in the fringe.

Certain especially vulnerable uses, hospitals, senior citizen housing, nursing homes, schools, and toxic material storage, are barred from the Floodplain Fringe District outright under paragraph 10 because of how hard they are to evacuate during flooding.

Violations & Fines

Constructing or substantially improving a structure in the Floodplain Fringe District below the required three-foot freeboard elevation violates § 5.49(6)(b)(1), and the city can withhold or revoke building approvals until the lowest floor elevation is corrected or certified. The city engineer's elevation records under paragraph 9 are the reference point used to confirm compliance during plan review and inspection.

Frequently Asked Questions

How high above the floodplain must my lowest floor sit in Southfield?
At least three feet above the elevation of the floodplain. Section 5.49(6)(b)(1) applies this freeboard requirement to the lowest floor designed or intended for human habitation or employment on new construction or substantial improvements in the Floodplain Fringe District, and it counts basements as part of that lowest floor.
Does Southfield keep records of how high floodplain-area homes are built?
Yes. Under § 5.49(6)(b)(9), the city engineer obtains and records the actual elevation of the lowest habitable floor, relative to mean sea level, for every new or substantially improved structure in the floodplain fringe, noting whether the structure has a basement or cellar.
Can a nursing home be built in Southfield's floodplain fringe?
No. Section 5.49(6)(b)(10) specifically prohibits hospitals, senior citizen housing, nursing homes, schools, and toxic material storage in the Floodplain Fringe District because these uses are difficult to evacuate safely during a flood event.

Sources & Official References

Other rules in Southfield

All Southfield rules

Compare Southfield to another location·View the Michigan environmental rules overview

Get notified when Flood Elevation Requirements in Southfield, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Oakland County handle flood elevation requirements.

Farmington Hills, MI
Some Restrictions