Troy, MI Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Zoning Ordinance § 12.02
Trigger
any project needing site plan review
Standard used
City Engineer's Design Standards
Oil separators
required for high grease/oil sites
Wetland use
needs DNR/EGLE and federal permits
Penalty
Municipal Civil Infraction, Chapter 100

Summary

Troy requires every development project subject to site plan review to use best management practices meeting the city's Engineering Design Standards, as set by the City Engineer. Section 12.02 of the Zoning Ordinance mandates on-site stormwater storage, limits impervious surfaces and grading, and requires oil separators on sites with heavy grease and oil runoff.

A. Intent. The intent of this Section is to encourage the use of structural, vegetative or managerial practices, commonly referred to as best management practices (BMP's), designed to treat, prevent, or reduce degradation of water quality due to storm water runoff. All development projects subject to site plan review shall use best management practices (BMP's) to prevent flooding, protect water quality, reduce soil erosion, maintain and improve wildlife habitat, and contribute to the aesthetic values of the project... C. Stormwater Management. All stormwater management plans shall meet the Engineering Design Standards adopted by the City as determined by the City Engineer, and shall utilize nonstructural control techniques to the maximum extent feasible, including, but not limited to: 1. Limitation of land disturbance and grading. 2. Maintenance of vegetated buffers and natural vegetation. 3. Minimization of impervious surfaces.

Full Breakdown

02 of Troy's Zoning Ordinance, effective July 23, 2026, ties stormwater control to the site plan review process required under Article 8: any project going through that review must use best management practices (BMPs) to prevent flooding, protect water quality, reduce soil erosion, and preserve wildlife habitat. Stormwater management plans must meet the City Engineer's Engineering Design Standards and rely on nonstructural techniques wherever feasible, including limiting land disturbance and grading, keeping vegetated buffers and natural vegetation, minimizing impervious surfaces, and using terraces, contoured landscapes, runoff spreaders, swales, and infiltration devices.

New development and redevelopment must provide on-site storage of stormwater at a volume and discharge rate the City sets, and site design must prioritize natural drainage patterns so alterations do not cause flooding or water-quality degradation for downstream neighbors. Where large volumes of grease and oil could accumulate, such as commercial and industrial parking areas, oil separators are required, and any site storing or using chemicals must submit a spill response plan for City approval. Wetlands may be used for stormwater management only if the developer obtains permits from the Michigan Department of Natural Resources and Environment (Michigan's EGLE) and any applicable federal agency. 03, which take precedence over the base zoning district's standards whenever the two conflict.

Violations & Fines

Stormwater compliance is enforced through site plan review: the Planning Department will not approve a site plan lacking the required BMPs, storage volume, or spill response plan. Once built, noncompliant drainage work is a Municipal Civil Infraction under Zoning Ordinance Section 3.08 and Chapter 100 of Troy's Code of Ordinances, and unpermitted alterations that flood or degrade water quality for downstream property owners can be declared a public nuisance per se, abatable by court order.

Frequently Asked Questions

Does every construction project in Troy need a stormwater plan?
Only projects that trigger site plan review under Article 8, typically new commercial, industrial and multi-family development, must submit a stormwater management plan meeting the City Engineer's Engineering Design Standards. Section 12.02 requires on-site storage, limits on impervious surface, and nonstructural controls like vegetated buffers and infiltration devices for those projects.
Can a developer use a wetland for stormwater retention in Troy?
Yes. Section 12.02.E allows wetlands to be used for stormwater management, but only after the developer secures permits from the Michigan Department of Natural Resources and Environment and any applicable federal agency; the wetland cannot be used without those approvals in hand.
What triggers the requirement for an oil separator on a Troy site?
Any site expected to accumulate large amounts of grease and oil, such as commercial or industrial developments with extensive paved parking areas, must install oil separators under Section 12.02.D.6 as part of its approved stormwater management design, before the City will sign off on the site plan.

Sources & Official References

Other rules in Troy

All Troy rules

Compare Troy to another location·View the Michigan environmental rules overview

Get notified when Stormwater Management in Troy, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Oakland County handle stormwater management.

Farmington Hills, MI
Some Restrictions