Key Facts

Governing section
Section 1248.03(f)
Permitting agency
Macomb County Public Works Office
State law tie-in
NREPA, Act 451 of 1994
Enacted by
Ordinance 481, passed 10-24-22
General penalty
Up to $500 fine or 93 days jail
Applies to
All land development site-grading plans

Summary

Clinton Township requires every site-improvement plan to include adequate soil erosion and sedimentation control measures, both specified on paper and actually followed during construction. Code Section 1248.03(f) ties the requirement to Michigan's Natural Resources and Environmental Protection Act (NREPA, Act 451 of 1994) and names the Macomb County Public Works Office, not the Township, as the agency that issues soil erosion permits before grading or building starts.

(f) Adequate soil erosion and sedimentation control measures shall be specified on the plans, and followed during construction, to conform to the requirements of Act 451 of the Public Act of 1994, entitled Natural Resources and Environmental Protection Act as amended. The Macomb County Public Works Office is the jurisdictional agency responsible for issuing soil erosion permits in Clinton Township.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-25: Local legislation current through May 26, 2026).

Full Breakdown

Clinton Township folds erosion control into Chapter 1248, the township's Engineering and Construction Standards, adopted by Ord. 481 on October 24, 2022. 03 governs site grading and storm water drainage for every land development project, and subsection (f) requires soil erosion and sedimentation control measures to be shown on the engineering plans and actually maintained while grading and construction are underway, not merely promised on paper. The requirement is tied directly to Michigan's Natural Resources and Environmental Protection Act, Act 451 of 1994, and the code names the Macomb County Public Works Office, not the Township Building Department, as the agency that issues the underlying soil erosion permit.

That permit sits alongside the Township's own site-grading approval: subsection (b) requires a site grading and drainage plan for nearly every development, and subsection (c) bars anyone from obstructing or altering approved drainage flow across a property. Before a certificate of occupancy issues, the Township Engineer must approve final site grading and drainage, and a registered engineer or surveyor must certify the graded site matches the approved plan. Developers working through winter can get a temporary certificate of occupancy if grading is weather-delayed, but only against a bond, letter of credit or cash deposit guaranteeing the outstanding work gets finished.

Because the erosion-control permit itself runs through the county rather than the township, a builder needs sign-off from both Macomb County Public Works and the Clinton Township Engineer before site work can proceed to occupancy.

Violations & Fines

Chapter 1248 carries no stand-alone erosion-control penalty; Section 1248.99 refers violations to the Code's general penalty at Section 202.99. Failing to comply with the required erosion and sedimentation controls exposes a violator to a fine of up to $500, up to 93 days imprisonment, or both, with each day the violation continues charged as a separate offense. The Township can also pursue equitable remedies, including forced removal of the noncompliant condition, on top of any fine.

Frequently Asked Questions

Who issues the soil erosion permit for a Clinton Township construction site?
The Macomb County Public Works Office issues the soil erosion permit, not the Clinton Township Building Department. Section 1248.03(f) of the Township's Engineering and Construction Standards designates Macomb County as the jurisdictional agency, so a developer needs the county permit in hand along with Township site-grading approval before work proceeds toward a certificate of occupancy.
What law requires erosion control on a Clinton Township building site?
Section 1248.03(f) ties the requirement to Michigan's Natural Resources and Environmental Protection Act, Act 451 of 1994. The ordinance requires that soil erosion and sedimentation control measures be specified on the approved engineering plans and actually followed on the ground throughout construction, not just noted for approval purposes.
What happens if a builder skips erosion control during grading?
Chapter 1248 has no separate erosion-control fine; Section 1248.99 sends violations to the Code's general penalty, Section 202.99. That allows a fine up to $500, up to 93 days in jail, or both, with each day of continued noncompliance counted as its own offense, plus any equitable remedy such as forced removal of the violation.

Sources & Official References

Other rules in Clinton Township

All Clinton Township rules

Compare Clinton Township to another location·View the Michigan environmental rules overview

Get notified when Erosion Control in Clinton Township, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Macomb County handle erosion control.

Sterling Heights, MI
Some Restrictions
Warren, MI
Some Restrictions