Skip to main content
CityRuleLookup

Clinton Township, MI Environmental Rules: Flood Zones (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Clinton Township, MI, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required for
Any structure or substantial improvement in 100-yr flood plain
Barred outright
Public/private institutions or assembly places
Issuing authority
Charter Township of Clinton
Accessory structures
Require engineer certification, anchoring
Governing ordinance
Ord. 260-A-499, passed 12-22-2025

Summary

Clinton Township requires a development permit before anyone locates a structure or obstruction, or makes substantial improvements to one, on land in the 100-year flood plain. Public and private assembly buildings are barred from the flood plain outright.

(a) Except as hereinafter provided in this section, it shall be unlawful for any person to do any of the following without obtaining a development permit from the Charter Township of Clinton:

(1) Locate any operation, obstruction or structure on lands in a 100-year flood plain.

(2) Make substantial improvements to any obstruction or structure in a 100-year flood plain. Maintenance of an obstruction or structure shall not be construed to be a substantial improvement.

(3) Locate any public or private institution or place of assembly in a flood plain.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-25: Local legislation current through May 26, 2026).

Full Breakdown

Chapter 1150, FW Floodway District, Flood Hazard Areas and Wetlands, governs development within the Township's mapped flood plains. 03(a) makes it unlawful, without first obtaining a development permit from the Charter Township of Clinton, to locate any operation, obstruction, or structure on land in a 100-year flood plain; to make substantial improvements to an existing obstruction or structure there, with routine maintenance not counted as a substantial improvement; or to locate any public or private institution or place of assembly in a flood plain at all.

Subsection (b) separately prohibits dredging, filling, dumping, or backfilling in the flood plain unless compensating excavation preserves the plain's flow and impoundment capacity. Subsection (c) extends the permit requirement to off-street parking, streets, roads, bridges, play equipment, sheds, garages, boathouses, utility lines, signs, fences, and similar structures, allowing them only if an engineer certifies the structure will not raise water surface elevation, obstruct flow, or reduce impoundment capacity, and the equipment is anchored against flotation. Certain low-impact uses, listed in subsection (d), such as crop cultivation, pasture, wildlife sanctuaries, and open-space recreation without a principal building in the floodway, are allowed without a permit.

The chapter was adopted under the combined authority of the Township Rural Zoning Act, the state Flood Plain Control Act, and the federal National Flood Insurance Act, and the current text was re-adopted by Ordinance 260-A-499, passed December 22, 2025. 09.

Violations & Fines

Building, filling, or substantially improving a structure in the 100-year flood plain without a development permit violates Section 1150.03. Section 1150.11 makes a violator liable to the Township for any expense, loss, or damage the violation causes, and courts may presume the unpermitted obstruction was the proximate cause of any resulting flood damage in a civil suit.

Frequently Asked Questions

Do I need a permit to build in a Clinton Township flood plain?
Yes. Section 1150.03(a) makes it unlawful to locate any structure or obstruction, or to substantially improve one, on land in the 100-year flood plain without first obtaining a development permit from the Township.
Can a church or assembly hall be built in the flood plain?
No. Section 1150.03(a)(3) prohibits locating any public or private institution or place of assembly in a flood plain, with no permit exception listed for that use.
What happens if I build without a flood plain permit and it causes damage?
Section 1150.11 makes the violator liable to the Township for resulting expense, loss, or damage, and creates a rebuttable presumption in court that the unpermitted obstruction caused any flooding damage to another person's land.

Sources & Official References

Other rules in Clinton Township

All Clinton Township rules

Compare Clinton Township to another location·View the Michigan environmental rules overview

Get notified when Flood Zones in Clinton Township, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Zones in Nearby Cities

How other cities in Macomb County handle flood zones.

Sterling Heights, MI
Significant Restrictions
Warren, MI
Significant Restrictions