Detroit, MI Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Standard
Lowest floor must clear base flood level
Applies to
New construction & substantial improvements
Permit
Floodplain permit required before building permit
Alternative
Non-residential may floodproof instead
Citation
Detroit City Code § 50-14-529

Summary

Detroit requires new construction and substantial improvements in flood hazard areas to elevate the lowest floor, including the basement, to or above the base flood elevation set by FEMA.

All new construction and substantial improvements of residential structures shall have the lowest floor, including the basement, elevated to or above the base flood level. The most recent base flood elevation data that was received from the Federal Emergency Management Agency shall take precedence over data from other sources.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 4).

Full Breakdown

Detroit City Code § 50-14-529 sets the elevation standard for the city's flood hazard areas, mapped along the Rouge River floodway. New construction and substantial improvements to residential structures must have the lowest floor, including any basement, built to or above the base flood elevation, using the most current FEMA data. Non-residential structures can meet the same elevation standard or be floodproofed watertight below that level, certified by a registered engineer or architect. A floodplain development permit from the Buildings, Safety Engineering, and Environmental Department is required before any work begins, per Section 50-14-527.

Violations & Fines

Building without meeting the base flood elevation standard, or without a floodplain development permit from Environmental Affairs, blocks issuance of a building permit or certificate of occupancy.

Frequently Asked Questions

Does the basement count toward the elevation requirement?
Yes. Detroit's code specifically includes the basement as part of the 'lowest floor' that must be elevated to or above the base flood level for residential structures.
Can a commercial building in a flood hazard area skip elevating?
Yes, if it is floodproofed watertight below the base flood level and a registered engineer or architect certifies the design meets Section 50-14-529(2)b.

Sources & Official References

Other rules in Detroit

All Detroit rules

Compare Detroit to another location·View the Michigan environmental rules overview

Get notified when Flood Elevation Requirements in Detroit, MI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Wayne County handle flood elevation requirements.

Livonia, MI
Some Restrictions
Dearborn, MI
Some Restrictions