Skip to main content
CityRuleLookup

Building Safety in Lawrence, MA (2026)

3 verified building safety rules for Lawrence, Massachusetts, sourced directly from the municipal code and official government pages.

Verified from official government sources

Lead Paint

Lawrence requires anyone removing, scraping or deleading lead paint in a structure to get a permit from the board of health first. The board writes the technical regulations that go into every permit, and the city's lead paint removal chapter, carried over from the prior municipal code, backs the permit with a flat monetary penalty for skipping it.

Lawrence Lead Paint Removal Permit

Some Restrictions

Lawrence, MA Code of Ordinances Sections 8.12.010, 8.12.020, 8.12.030

Any person, firm or corporation engaged in the practice of removing, scraping or deleading lead paint in any structure must obtain a permit from the board of health. ... The board of health shall prepare regulations for the removing, scraping or deleading lead paint in all structures and permits issued shall include the regulations. ... Any person, firm or corporation who engages in the practic...

Green Building Code

Lawrence has locally adopted the Massachusetts Stretch Energy Code, 780 CMR Appendix 115.AA, as the energy-efficiency standard for new residential and commercial construction, applying to all permits applied for or issued since July 1, 2018.

Lawrence Stretch Energy Code Adoption

Some Restrictions

Lawrence, MA Code of Ordinances §§15.15.010, 15.15.060

Stretch Energy Code. Codified by the board of building regulations and standards as 780 CMR Appendix 115.AA of the Massachusetts Building Code, the Stretch Energy Code is an appendix to the Massachusetts Building Code, to improve the energy efficiency of buildings built to this code... This chapter shall apply to all permits applied for or issued after July 1, 2018.

Electrical Permits

Lawrence adopts the National Electrical Code for all wiring work and requires a permit and inspection before any current is turned on. Municipal Code 15.08.170 requires 24-hour written notice to the electrical inspector before starting work, and 15.08.200 charges a fee for every permit and inspection.

Lawrence Electrical Permit and NEC Rules

Some Restrictions

Lawrence Municipal Code §§ 15.08.050, 15.08.170, 15.08.200

15.08.050 - National Electrical Code adopted—Enforcement. The National Board of Fire Underwriters Code for electric wiring and apparatus, as recommended by the National Fire Protection Association, is adopted. ... 15.08.170 - Written notice to inspector required prior to commencing work. No person or agent thereof shall commence any new work, additions, alterations or extensions to old work, in...