Building Safety in Revere, MA (2026)
6 verified building safety rules for Revere, Massachusetts, sourced directly from the municipal code and official government pages.
Verified from official government sources
Fire Sprinkler Requirements
Revere accepted G.L. c. 148, § 26I on June 13, 1996, requiring automatic sprinkler systems in newly built or substantially rehabilitated residential buildings with four or more dwelling units, including apartments, lodging houses and hotels. The acceptance, codified in Appendix B, § B.020 of the Revere Municipal Code, also fixes a local definition of 'substantially rehabilitated.'
Revere Sprinkler Mandate for Multi-Unit Housing
Some RestrictionsRevere Municipal Code § B.020 (Appendix B)
G.L. Ch. 148 § 26I ... Relative to the installation of automatic sprinklers in certain residential structures. For the purpose of the acceptance of Section 26I of Chapter 148 M.G.L., the term "substantially rehabilitated" shall mean complete rehabilitation of the structure to the equivalent of new construction ... Accepted June 13, 1996
Green Building Code
Revere adopted the Massachusetts Stretch Energy Code, 780 CMR Appendix 115.AA, as its own local requirement effective January 1, 2012, under Municipal Code § 15.04.151. The building inspector enforces it, and violations carry the same penalties as any other building code breach under Chapters 1.12 and 1.16.
Revere Stretch Energy Code Adoption
Some RestrictionsRevere Municipal Code § 15.04.151
The Stretch Energy Code, as codified by the Board of Building Regulations and Standards as 780 CMR Appendix 115.AA, including any amendments or modifications, is adopted by the City and herein incorporated by reference in this section. This Stretch Energy Code shall be in effect as of January 1, 2012. Any violation of such Stretch Energy Code shall constitute a violation of this section as well...
Building Permits
Revere Municipal Code § 15.04.010 blocks the inspector of buildings from issuing any building permit until the applicant pays the required fee to the city collector, under the fee schedule set out in Table I. The requirement runs alongside Section 118.0 of the Massachusetts State Building Code.
Revere Building Permit Fee Rule
Some RestrictionsRevere Municipal Code § 15.04.010
Pursuant to the provisions of Section 118.0 of the Massachusetts State Building Code, no permit shall be issued by the inspector of buildings until the required fee has been paid to the city collector in accordance with the schedule of rates set out in Table I of this revision.
Electrical Permits
Revere requires an outside electrical disconnection device on new construction, substantial renovations, service alterations, and occupancy changes under Municipal Code § 15.04.155. The wire inspector enforces the requirement, which lets responders cut power to the structure in an emergency, and it applies to anyone applying for an electrical permit.
Revere Electrical Disconnect Device Rule
Some RestrictionsRevere Municipal Code § 15.04.155
All persons applying for an electrical permit for all new construction, where substantial renovation is involved, or any alterations to an existing electrical service, or any change in the use or occupancy of the structure, shall be required by the wire inspector, to install an outside electrical disconnection device to shut down electrical power to the structure in the case of an emergency.
Plumbing Permits
Revere Municipal Code § 15.04.020 bars the plumbing, gas, and electrical inspectors from issuing a permit until the applicant pays the fee to the city collector under the schedule set out in Table I of the Revised Ordinances, mirroring the building permit fee rule in § 15.04.010.
Revere Plumbing & Gas Permit Fees
Some RestrictionsRevere Municipal Code § 15.04.020
No permit shall be issued by the plumbing, gas and electrical inspectors until the required fee has been paid to the city collector in accordance with the schedule of rates set out in Table I of this revision.
Building Inspections
In Revere, the building inspector examines plans, buildings and premises to check zoning-title compliance, and can withhold or revoke permits found in violation. Violators face up to three hundred dollars a day, and the inspector must detail the violation, remedy and appeal rights in writing within fourteen days.
Revere Building Inspector Enforcement Rules
Some RestrictionsRevere Municipal Code §§ 17.60.020, 17.60.030, 17.60.040 and 17.60.090
Except as otherwise provided, this title shall be administered by the building inspector, who shall be appointed by the mayor as inspector in accordance with the State Building Code and who shall have such powers as are conferred upon him by this title. ... As of the effective date of the ordinance from which this title derives, it shall be the duty of the building inspector to cause any plans,...