Stormwater Management

Rock Hill, South Carolina bans dumping anything but stormwater into its storm drain system and runs a dedicated Stormwater Management Utility to enforce it. Violations can draw a written notice, a civil penalty of up to $500 per day, and even a stop-work order on construction sites.

Rock Hill Stormwater Discharge Rules

Significant Restrictions

Rock Hill City Code § 29-306(7)a

No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the City of Rock Hill stormwater systems any pollutants or waters containing any pollutants, other than stormwater. Prohibited substances include, but are not limited to: Sewage; petroleum; anti-freeze; chemicals; animal waste; yard waste; paints; construct...

Erosion Control

Anyone disturbing land from a vacant parcel in Rock Hill, South Carolina needs a grading permit before work starts, and the Planning & Development Director will not issue one until reviewing a Stormwater Management and Sediment Control Plan that meets the city's Chapter 7 construction standards, aimed at limiting soil erosion and sedimentation onto neighboring land.

Rock Hill Grading Permit Erosion Control Rule

Some Restrictions

Zoning Ordinance of the City of Rock Hill § 2.7.9

The purpose of the grading permit application is to limit negative impacts on adjacent lands from soil erosion and sedimentation, and to protect existing vegetation on sites or parcels of land subject to land-disturbing activities... A grading permit is required prior to undertaking any activities that disturb the land from a vacant site or parcel or land... Before issuing a grading permit, the...

Flood Zones

Rock Hill regulates development inside FEMA-designated special flood hazard areas under the Flood Insurance Study dated May 16, 2017. Anyone building, filling, grading or otherwise developing land in those zones needs a development permit from the building official before work begins, per City Code § 10-325 and § 10-326.

Rock Hill Floodplain Development Permit Rule

Some Restrictions

Rock Hill City Code § 10-325

This article shall apply to all areas of special flood hazard within the jurisdiction of the City of Rock Hill as identified by the Federal Emergency Management Agency in its Flood Insurance Study, dated May 16, 2017, with accompanying maps and other supporting data that are hereby adopted by reference and declared to be a part of this article. Upon annexation, any special flood hazard areas id...

Flood Elevation Requirements

New construction and substantially improved buildings in a Rock Hill flood hazard area must have their lowest floor at least two feet above the base flood elevation. City Code § 10-366(1) bars basements outright in those zones, and § 10-332 defines that two-foot cushion as the city's freeboard requirement.

Rock Hill Base Flood Elevation Freeboard Rule

Some Restrictions

Rock Hill City Code § 10-366(1)

Residential construction. New construction and substantial improvement of any residential structure (including manufactured homes) shall have the lowest floor elevated no lower than two feet above the base flood elevation. No basements are permitted. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters s...