Stormwater Management

Temecula bans any discharge other than stormwater into its storm drain system under Municipal Code § 8.28.200, covering everything from gas-station wash water and swimming-pool backwash to pet waste, sediment, and irrigation runoff. The city engineer administers the program under the city's NPDES MS4 permit, and violations can trigger permit revocation, nuisance abatement, and misdemeanor prosecution.

Temecula Stormwater Discharge Rules

Significant Restrictions

Temecula Municipal Code § 8.28.200

The following discharges are prohibited: 1. Discharges into and from MS4s in a manner causing, or threatening to cause, a condition of pollution, contamination, or nuisance (as defined in CWC Section 13050), in receiving waters within the city; ... 6. Wash water from hosing or cleaning gas stations, vehicle maintenance facilities, or other related services; ... 13. Swimming pool and other non-p...

Erosion Control

Every construction and grading project in Temecula must control its runoff under Chapter 18.18 of the Municipal Code. Section 18.18.020 requires pollutants to stay on site and be reduced to the maximum extent practicable, and any project disturbing an acre or more of soil must also carry state construction general permit coverage and a stormwater pollution prevention plan.

Temecula Construction Erosion Control Rules

Some Restrictions

Temecula Municipal Code § 18.18.020 (Construction Runoff Compliance)

All individual construction and grading projects shall implement measures to ensure that pollutants: (1) are not discharged from the site; (2) shall be reduced to the maximum extent practicable (MEP); and (3) will not cause or contribute to an exceedance of water quality objectives in the local natural watercourses. ... Develop and implement an erosion and sediment control plan to manage stormw...

Flood Zones

Any construction, fill, or other development within Temecula's mapped special flood hazard areas, flood-related erosion areas, or mudslide-prone areas needs a development permit from the floodplain administrator before work begins. Applications must show existing and proposed elevations, drainage facilities, and any watercourse alteration. Encroaching into a designated floodway is barred unless a registered engineer certifies the project won't raise flood levels during the base flood.

Temecula Floodplain Development Permits

Some Restrictions

Temecula, CA, Municipal Code § 15.12.120

A development permit shall be obtained before any construction or other development begins within any area of special flood hazard, areas of flood-related erosion hazard or areas of mudslide (i.e., mudflow) established in Section 15.12.070 "Basis for establishing the areas of special flood hazard."

Defensible Space

Every improved parcel in Temecula must maintain 100 feet of defensible space around every structure by clearing hazardous vegetation and combustible material year-round. The Fire Chief enforces the rule under Chapter 8.16, and owners who ignore a thirty-day abatement notice face city-ordered clearing billed as a lien on the property.

Temecula Defensible Space Requirements

Significant Restrictions

Temecula, CA, Municipal Code § 8.16.020 (Duty to Abate Hazardous Vegetation and Fuel)

It shall be the duty of every owner or person in control of any real property or interest therein to abate therefrom, and from all sidewalks, privately maintained roads, and parkways, except for those roads accepted into the city maintained system (publicly maintained roads), all hazardous vegetation and combustible materials that constitutes a fire hazard which may endanger or damage neighbori...

Flood Elevation Requirements

Temecula requires the pad of every new or substantially improved building in a mapped special flood hazard area to sit at least one foot above the FEMA base flood elevation shown on the FIRM. In Zone AO, the pad must clear the highest adjacent grade by one foot, or two feet if no adjacent-grade elevation is on the map. A registered engineer or surveyor must certify the pad elevation before the building permit issues, then certify the finished lowest floor on a FEMA Elevation Certificate.

Temecula Flood Elevation Requirements

Some Restrictions

Temecula, CA, Municipal Code § 15.12.150(C)(1)

All new residential and nonresidential construction and substantial improvements shall have the pad elevation elevated to a minimum of one foot above the FIRM base flood elevation. Prior to issuance of building permit, the pad elevation shall be certified by a registered professional engineer or surveyor. Upon completion of the structure, the elevation of the lowest floor, including basement, s...