Washington County, UT Data Centers & Crypto Mining: Crypto Mining Rules (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
§ 10-4-1 definition; § 10-11-2 use chart
Capacity cap
10 to 50 MW; larger not permitted
Allowed zone
Industrial (IND) only, not MFG
PUE requirement
1.2 or less
Water certification
Alliance for Water Stewardship required
Adopted
Ord. 2026-1321-O, May 19, 2026

Summary

Washington County caps every data, AI, or crypto mining center at 50 megawatts of capacity under Code § 10-4-1's definition, with facilities above that size 'not permitted.' The use chart in § 10-11-2 allows crypto and data centers only in Industrial zones between 10 and 50 megawatts.

These county ordinances apply to unincorporated areas of Washington County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

DATA, AI, CRYPTO CENTER: Specialized facilities for storage, management, processing, or transmission of digital data, cloud services, blockchain validation (GPUs, CPUs, ASICs, etc.), or high-density compute environments for machine learning, neural networks, or training data via the interconnection and operation of information technology, network telecommunications, and utility infrastructure. County regulations apply to all facilities, regardless of the generation method, that use or seek approval to use ten megawatts of capacity and up to a maximum of 50 megawatts of capacity. Larger-capacity facilities are not permitted. A facility may be used by one or multiple owners or customers, but all are responsible for operational compliance.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-17: Code current through: Ord. 2026-1329-O, passed 8-18-2026).

Full Breakdown

" The definition sets the county's hard capacity ceiling: "County regulations apply to all facilities, regardless of the generation method, that use or seek approval to use ten megawatts of capacity and up to a maximum of 50 megawatts of capacity. " The Manufacturing and Industrial Use Chart at § 10-11-2 confirms the use is permitted only in the Industrial (IND) zone, not the Manufacturing (MFG) zone, and repeats the "10 MW to 50 MW maximum" cap. 2 or less, a hard daily power-use ceiling of 50 megawatts regardless of source, and a yearly public report on the company website and in two local newspapers disclosing monthly water and electricity use.

These provisions were added to Title 10 by Ordinance 2026-1321-O, adopted May 19, 2026, which the county commission approved after a Planning Commission public hearing held May 12, 2026.

Violations & Fines

A crypto mining or data center facility that exceeds the 50-megawatt cap, skips the required Alliance for Water Stewardship certification, or fails to publish its annual monitoring report is out of compliance with § 10-11-2 and § 10-11-4. County Ord. § 10-1-22 penalizes Title 10 violations with a $250-per-day civil fine after a 10-day cure notice, or prosecution as a class B misdemeanor.

Frequently Asked Questions

Is there a size limit on crypto mining facilities in Washington County?
Yes. Section 10-4-1 defines a Data, AI, Crypto Center and caps it at 50 megawatts of capacity, stating flatly that 'larger-capacity facilities are not permitted.' The use chart in § 10-11-2 confirms the facility is allowed only between 10 and 50 megawatts.
What zone allows a data or crypto mining center?
The Industrial (IND) zone only. The Manufacturing and Industrial Use Chart at § 10-11-2 lists 'Data, AI, crypto center' as permitted in the IND column but leaves the MFG column blank, so the use is not allowed in a Manufacturing zone.
What operating standards apply to an approved crypto or data center?
Section 10-11-4 requires noise attenuation systems, air-cooled or closed-loop water systems, Alliance for Water Stewardship certification, a power usage effectiveness rating of 1.2 or less, a 50-megawatt daily power ceiling, and a public annual report on water and electricity use.

Sources & Official References

Other rules in Washington County

All Washington County rules

Compare Washington County to another location·View the Utah data centers & crypto mining overview

Get notified when Crypto Mining Rules in Washington County, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Crypto Mining Rules in Cities Across Washington County