Unlike many rural counties, Butte County has a codified Noise Control Ordinance. Section 41A-7 caps noise at sensitive receptors at 50 dBA Leq daytime and 40 nighttime in non-urban areas (55/45 in urban areas). These limits apply to a data center's chillers, fans, and backup generators.
Butte County enforces a codified Noise Control Ordinance (Municipal Code Chapter 41A), not merely General Plan policy. Section 41A-7 sets exterior standards at noise-sensitive receptors: in non-urban areas 50 dBA Leq daytime, 45 evening, and 40 nighttime; in urban areas 55, 50, and 45 dBA. Maximum instantaneous (Lmax) limits run higher. The General Plan 2030 Health and Safety Element applies these same standards to stationary, non-transportation sources such as a data center's cooling and generator equipment, and Policy HS-P1.8 specifically requires generator noise near homes to be regulated. Policy HS-P1.6 requires an applicant-funded acoustical study for noise-producing projects near sensitive uses. Nighttime runs 10 PM to 7 AM.
A data center whose cooling or generator noise exceeds the Section 41A-7 limits at a neighboring receptor violates the Noise Control Ordinance. The county can deny or condition permits, require enclosures, barriers, or setbacks, and pursue abatement until it conforms.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
Chico, CA
A building/zoning permit is generally required in Chico for fences over 6 feet or masonry/retaining walls; pool barrier fences must meet the California Build...
Chico, CA
Chico is a Tree City with a strong tree-preservation ordinance; removing protected or heritage trees, including many on private property, requires a city tre...
Chico, CA
Chico does not ban artificial turf and the City permits it as part of drought-tolerant landscapes. State law (AB 1572, Cal. Water Code Β§10608.14, eff. 2027) ...
Chico, CA
Under CMC Β§19.68.050 and Β§19.68.070, at least 90% of plants in non-turf areas must be suited to Chico's climate and require minimal water once established. S...
Chico, CA
City of Chico parks β including the 3,670-acre Bidwell Park β restrict drone operations under CMC Title 12R; advance written permission is required. CARD-man...
Chico, CA
Commercial drone work in Chico requires an FAA Part 107 Remote Pilot Certificate; the city does not issue separate commercial UAS permits. Operations on city...
See how Chico's data center noise limits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.