Key Facts

Site plan approval
required under § 44-1709
Roof appurtenance height cap
65 feet
Natural buffer strip
100 feet or 10% of lot
Parking ratio
1.5 spaces per employee
Low-frequency noise at 50 feet
30 decibels max
Adopted
April 28, 2025 (Ord. 2025-034)

Summary

Bloomington regulates large data centers under City Code § 44-1048, requiring administrative site plan approval, articulated facades with windows or material changes along public frontages, a 100-foot (or 10%-of-lot) natural buffer strip, 1.5 parking spaces per employee, and low-frequency noise limits down to 30 decibels at 50 feet.

Administrative site plan approval shall be required pursuant to § 44-1709 of this Code. ... Off-street parking shall be provided at a rate of at least 1.5 spaces per employee and shall be provided for each phase of development prior to the occupancy of such. ... A natural buffer strip, of at least 100 feet or 10% of the relevant lot dimension (width for side yards, depth for front and rear yards), whichever is less.

Full Breakdown

Adopted April 28, 2025 by Ordinance No. 2025-034, § 44-1048 of the Zoning Code creates a dedicated set of siting and design standards for data centers, layered on top of ordinary district regulations. Every data center must obtain administrative site plan approval under § 44-1709 before construction. Architectural standards require any building elevation facing a public right-of-way to either change primary facade material, pattern, texture, color or accent every roughly 150 horizontal feet, or devote at least 30% of the facade to windows, doors or similar fenestration; the primary entrance must be visually differentiated from the rest of the facade and project or recess from the adjoining wall plane.

Necessary roof appurtenances such as chimneys, parapets, cooling towers and antennas may exceed the district's height limit but never more than 65 feet. 5 spaces per employee for each development phase before that phase is occupied, driveways carrying continuous truck traffic must be paved at least 25 feet wide, and secure entry points need a turning radius sized for a 26-foot truck so vehicles never have to back onto the public road. Buffering requirements add a natural buffer strip of at least 100 feet, or 10% of the relevant lot dimension if that is less, plus landscape yard treatments (TY-1 or TY-3, depending on yard depth) along property lines not covered by compliant architecture.

Low-frequency noise from the facility is capped at 50 decibels at the lot line, 35 decibels at 25 feet, and 30 decibels at 50 feet, on top of the general noise standard of § 44-911C where the site sits in a B-1 or M-1 district.

Violations & Fines

Community Development enforces § 44-1048 through the mandatory administrative site plan review; building a data center without approved site plan approval, without the required facade articulation or buffer strip, or exceeding the low-frequency noise limits at the property line is a zoning violation subject to code enforcement action and can hold up occupancy until the design or operations are corrected.

Frequently Asked Questions

Does a new data center need site plan approval in Bloomington?
Yes. City Code § 44-1048, subsection A, requires administrative site plan approval under § 44-1709 before a data center can be built, covering the facility's design, buffering, parking and drainage.
How tall can data center rooftop equipment be?
Chimneys, cooling towers, antennas and similar appurtenances may exceed the zoning district's height limit but are capped at 65 feet under § 44-1048, subsection B(2), measured from average finished grade to the highest point.
What buffer does a data center need from neighboring property?
Section 44-1048, subsection D(1), requires a natural buffer strip of at least 100 feet, or 10% of the relevant lot dimension if that is smaller, plus landscaped yard treatment along property lines not screened by qualifying architecture.
Are there noise limits for data centers in Bloomington?
Yes. Low-frequency noise is capped at 50 decibels at the facility's lot line, 35 decibels at 25 feet, and 30 decibels at 50 feet under § 44-1048, subsection E(2), in addition to the City's general noise standard in § 44-911C.

Sources & Official References

Other rules in Bloomington

All Bloomington rules

Compare Bloomington to another location·View the Illinois data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Bloomington, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.