Berkeley County, SC Environmental Rules: Erosion Control (2026)
Key Facts
- Front/side yard requirement
- sod required (§ 11-62)
- Rear yard minimum
- hydro-seed (§ 11-62)
- Slope trigger
- swales/slopes over 15% must be sodded
- Flowerbed exception
- up to 6 ft wide unsodded (§ 11-62)
- Adopted
- Ord. No. 08-06-30, June 23, 2008
- Penalty
- up to $200 fine / 30 days jail (§ 11-103)
Summary
Berkeley County Code Sec. 11-62 ties every project to the county's Stormwater Drainage Ordinance and sets a sodding floor for new residential construction: front and side yards must be sodded, rear yards at least hydro-seeded, and any swale or graded slope over 15 percent sodded, with a narrow flowerbed exception.
All properties shall comply with the Berkeley County Stormwater Drainage Ordinance. New residential construction shall, at a minimum, sod front and side yards, hydro-seed rear yards, sod all swales and graded slopes exceeding 15 percent. Areas that are not affected by construction and have natural vegetation established are exempt from these requirements. Flowerbeds around the perimeter of the home cannot exceed six feet in width without being sodded, unless approved by the chief building official.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 37).
Full Breakdown
Sec. 11-62, in the permits and inspections division of the building code chapter, requires 'all properties' to comply with the Berkeley County Stormwater Drainage Ordinance and then sets specific minimums for new residential construction: sod on the front and side yards, hydro-seed at minimum on the rear yard, and sod on all swales and graded slopes exceeding 15 percent. The section carves out land not affected by construction that already has natural vegetation established, which is exempt from the sodding and hydro-seeding minimums entirely. It also addresses a common workaround: flowerbeds around the perimeter of the home cannot exceed six feet in width without being sodded, unless the chief building official approves a wider unsodded bed.
The section was adopted by Ord. No. 08-06-30 on June 23, 2008, and sits alongside the addressing rule in Sec. 11-63 and the accompanying-documents rule in Sec. 11-61, all enforced by Berkeley County's permitting, planning and zoning, and building and codes departments as part of the standard residential permitting process, since Sec. 11-64 bars any covered work from starting without a valid permit in the first place. Because Sec. 11-61 already conditions the certificate of occupancy on proof that water, sewer, or DHEC septic requirements and FEMA elevation certificates are satisfied, the erosion-control sodding and seeding standard functions as a final-inspection checkpoint before a new home can be occupied.
Violations & Fines
Sec. 11-62 sits within chapter 11's technical-code framework, so noncompliance is enforced under Sec. 11-103's general chapter 11 penalty: a misdemeanor punishable by a fine up to $200.00 and/or up to 30 days in jail, with each day of continued noncompliance a separate offense. The chief building official can also withhold final inspection sign-off, and therefore the certificate of occupancy, until the required sodding, hydro-seeding, or slope stabilization is complete.
Frequently Asked Questions
Do I have to sod my entire new-construction lot?
What triggers the slope-sodding requirement?
Can I leave a flowerbed unsodded around my house?
What happens if I skip the required sodding?
Sources & Official References
Other rules in Berkeley County
Compare Berkeley County to another location·View the South Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.