Greenville County, SC Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Land disturbance permit before clearing or grading
Governing law
Greenville County Code §§ 8-70, 8-71 (Art. III, Div. 4)
Sediment removal standard
80% TSS removal or 0.5 ml/l settleable solids
Design storm basis
10-year, 24-hour storm event
Wet basins
Cannot be used as construction sediment basins

Summary

Clearing, stripping, excavating or grading land anywhere in unincorporated Greenville County requires a land disturbance permit first. The county's stormwater ordinance sets numeric sediment-control standards, including an 80% removal rate for suspended solids on active construction sites.

These county ordinances apply to unincorporated areas of Greenville County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Except as provided in § 8-57 of this article, a person may not perform clearing, stripping, excavating, or grading of land or create borrow pits, spoil areas, material processing plants or related facilities without first obtaining a land disturbance permit from the County. ... Development shall be fitted to the topography and soils so as to create the least erosion potential. Natural vegetation shall be retained and protected wherever possible. ... Only the smallest practical area shall be exposed and then only for the shortest practical period of time. ... All sediment control BMPs shall be designed and installed to meet a minimum sediment removal efficiency of 80% for total suspended solids (TSS) or greater or a 0.5 ml/l settleable solid effluent concentration using a 10-year, 24-hour design storm event whichever is less.

Full Breakdown

Greenville County's stormwater management article, Chapter 8, Article III, Division 4, bars a person from clearing, stripping, excavating or grading land, or creating borrow pits, spoil areas or material processing plants, without first obtaining a land disturbance permit from the county (Sec. 8-70). Property owners likewise cannot permit that activity on land they own unless the appropriate county and SCDES mining permits are in hand. Every project's Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) must include a Best Management Practices section addressing installation, maintenance and inspection of each erosion-control measure, built to SCDES's General Permit for Stormwater Discharges for Construction Activities and the county's Stormwater Management Design Manual (Sec.

8-71). Required design elements include fitting development to existing topography and soils to minimize erosion, retaining natural vegetation wherever possible, using vegetative rather than structural stream-bank stabilization where feasible, and exposing only the smallest practical area for the shortest practical time. 5 ml/l settleable solids standard, under a 10-year, 24-hour design storm, whichever is less strict, and all sediment control best management practices on a site must meet that same removal threshold. Wet retention basins built for permanent stormwater management cannot double as construction-phase sediment basins. Temporary erosion and sediment controls must stay in place and be maintained continuously until the disturbed ground reaches final stabilization.

Violations & Fines

Grading, clearing or excavating without a land disturbance permit, or running a site that fails the sediment-control design standards of Section 8-71, is enforced under the stormwater article's general violations and penalties provisions (Sec. 8-111 et seq.), which authorize criminal penalties, stop-work orders, permit suspension or revocation, and civil penalties layered on top of corrective-action orders from the Stormwater Management Director.

Frequently Asked Questions

Do I need a permit before grading land in unincorporated Greenville County?
Yes. Section 8-70 requires a land disturbance permit from the county before clearing, stripping, excavating or grading land, or creating borrow pits, spoil areas or material processing plants, unless an exemption in Section 8-57 applies.
What sediment removal rate must a construction site meet?
Section 8-71(f)-(h) requires sediment basins, traps and all sediment control best management practices to achieve at least 80% removal of total suspended solids, or a 0.5 ml/l settleable solids effluent standard, under a 10-year, 24-hour design storm, whichever is less.
Can a permanent stormwater pond double as a construction sediment basin?
No. Section 8-71(f)(4) specifically bars using on-site stormwater retention structures, known as wet basins, as a sediment basin during construction; a separate temporary sediment control must be used instead.

Sources & Official References

Other rules in Greenville County

All Greenville County rules

Compare Greenville County to another location·View the South Carolina environmental rules overview

Get notified when Erosion Control in Greenville County, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Greenville County