Key Facts

General stabilization deadline
No later than 14 days after activity ceases
Steep slopes
Temporarily stabilized within seven days
Cover crop survival
Minimum 70% for the year after stabilization
Maintenance fixes
Before next storm, never more than seven days
Civil penalty
$50 to $5,000 per day of violation
Plan seal
Registered engineer or landscape architect licensed in Tennessee

Summary

Cleared land in the Town of Collierville, Tennessee must be stabilized within 14 days after construction activity stops, and steep slopes within seven days. Stabilized areas must keep 70% cover crop survival for a year. The Town Engineer inspects sites and can issue stop work orders.

(A) Any area of land from which the natural vegetative cover has been either partially or wholly cleared by development activities shall be stabilized. Stabilization measures shall be initiated as soon as possible in portions of the site where construction activities have temporarily or permanently ceased. Temporary or permanent soil stabilization at the construction site (or a phase of the project) must be completed no later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. (B) Steep slopes shall be temporarily stabilized not later than seven days after construction activity on the slope has temporarily or permanently ceased. ... (E) Every stabilized area must exhibit survival of a minimum of 70% of the cover crop throughout the year immediately following stabilization. Revegetation must be repeated in successive years until the minimum 70% survival for one year is achieved.

Full Breakdown

Section 152.209 of the Collierville Code of Ordinances governs stabilization of any area where natural vegetative cover has been partially or wholly cleared by development activities. Stabilization measures start as soon as possible in portions of the site where work has stopped, and temporary or permanent stabilization must be finished no later than 14 days after construction activity in that portion has temporarily or permanently ceased. Steep slopes get a tighter clock of seven days. Permanent stabilization with perennial vegetation, or another permanently stable, non-eroding surface, replaces temporary measures as soon as practicable, and reseeding must be accompanied by straw mulch or its equivalent until the cover crop is established over 90% of the seeded area. Every stabilized area must show survival of a minimum of 70% of the cover crop for the year after stabilization, and revegetation repeats in successive years until that is achieved. A landscaping plan must also say who maintains the vegetation after construction.

The paperwork sits upstream. Under § 152.204 a person must provide proof of coverage (NOC) under the state construction general permit before any land disturbing activity, and under § 152.205 must prepare and implement a Stormwater Pollution Prevention Plan sealed by a registered professional engineer or landscape architect licensed in the state. Section 152.211 puts routine inspections on the owner/operator, and maintenance needs must be fixed before the next storm event and in no case more than seven days after the need is identified. Section 152.212 requires a notice posted near the main entrance with the NOC tracking number and a local contact, and on-site records including a rain gauge, twice weekly inspection reports and the inspector's Fundamentals of Erosion Prevention and Sediment Control Level 1 certification. The Town Engineer inspects active and inactive sites under § 152.210.

Violations & Fines

Under § 152.999 the Town Engineer can assess a civil penalty of not less than $50 and not more than $5,000 per day, each day a separate violation. Section 152.503 allows stop work orders requiring immediate cessation of construction, § 152.504 allows suspension or revocation of the project permit, and § 152.505(E) lets the Town use its own forces to fix erosion controls and bill the responsible party or collect against the project's bond.

Frequently Asked Questions

How fast must a Collierville site be stabilized after work stops?
Section 152.209 requires temporary or permanent soil stabilization no later than 14 days after construction activity in that portion of the site has ceased. Steep slopes must be temporarily stabilized not later than seven days after activity on the slope has ceased. Stabilization measures start as soon as possible.
What cover must a reseeded area reach in Collierville?
Reseeding must be done with an annual or perennial cover crop accompanied by straw mulch or its equivalent until the crop is established over 90% of the seeded area. Every stabilized area must then show survival of a minimum of 70% of the cover crop throughout the following year, repeating revegetation until it does.
Who has to inspect a construction site in the Town of Collierville?
The owner/operator inspects permitted sites under § 152.211 in accordance with the state construction general permit, and fixes maintenance needs before the next storm event and within seven days. The Town Engineer or a designee separately monitors active and inactive sites under § 152.210 and directs corrections.
Can the Town halt a project over erosion problems?
Yes. Section 152.503 lets the Town Engineer issue stop work orders requiring immediate cessation of construction, except cleanup and control work, when a notice of violation is ignored or construction poses a significant threat to water quality. Section 152.504 adds permit suspension or revocation until the violations are cured.

Sources & Official References

Other rules in Collierville

All Collierville rules

Compare Collierville to another location·View the Tennessee environmental rules overview

Get notified when Erosion Control in Collierville, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in this county handle erosion control.

Memphis, TN
Some Restrictions