Hemet, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Standards
Clean Water Act, NPDES, MS4 permit
Maintenance timing
Before and after each rainstorm
City remedy
City completes work, bills permittee
Backed by
Permittee's posted cash/bond security

Summary

Hemet grading permits must include an erosion and sediment control plan meeting Clean Water Act, MS4, and NPDES standards, maintained through every rainstorm during construction.

All erosion and sediment control plans shall conform to the requirements of the Grading Standards and meet the objectives and requirements of the Clean Water Act and its associated regulations, the city's MS4 permit, the construction general permit, NPDES requirements, and any other law, regulation, ordinance, permit or authorization applicable to activities authorized by the permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 69 Update 2).

Full Breakdown

Hemet City Code § 67-18(a) requires every erosion and sediment control plan submitted with a grading permit to conform to the city's Grading Standards and meet the objectives of the Clean Water Act, the city's MS4 permit, the state construction general permit, and NPDES requirements. Under § 67-18(c), permittees must clear silt and debris from check dams, desilting basins, curbs, gutters, and other stormwater conveyances before and after every rainstorm, and must evaluate and repair the control system as needed. If a permittee fails to install or maintain required controls, § 67-18(b) lets the city engineer order the work done and bill it against the permittee's posted security.

Violations & Fines

Failure to maintain erosion controls lets the city engineer complete the work and charge it against the permittee's posted security; ongoing noncompliance is a public nuisance enforceable by administrative citation under § 67-23.

Frequently Asked Questions

What happens if erosion controls fail during a storm?
The permittee must promptly evaluate and repair the system; if they don't, the city engineer can do the work and charge the permittee's posted security under § 67-18(b).
Is an erosion control plan required for every grading permit?
Yes, § 67-6(b) requires an erosion and sediment control plan with every grading permit application.

Sources & Official References

Other rules in Hemet

All Hemet rules

California rules heatmap·Compare Hemet to another location·View the California environmental rules overview

Get notified when Erosion Control in Hemet, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Riverside County handle erosion control.

Corona, CA
Some Restrictions
Menifee, CA
Some Restrictions
Moreno Valley, CA
Some Restrictions
Temecula, CA
Some Restrictions
Palm Springs, CA
Some Restrictions
Riverside, CA
Some Restrictions
Murrieta, CA
Significant Restrictions