Rock Island County, IL Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- § 152.158
- Who's responsible
- Property owner and site contractors
- Compliance tool
- Best management practices (BMPs)
- Fine range
- $250 to $1,500 per offense
- Appeal window
- 15 days from notice of violation
- Enforcement option
- Stop work order (§ 152.113(A))
Summary
Anyone doing construction work in unincorporated Rock Island County must use best management practices to keep sediment from leaving the site, limit disturbed areas, and clean up any sediment tracked onto public streets right away. The property owner and contractor share responsibility for compliance.
BMPs shall be implemented to prevent the release of sediment from construction sites. Disturbed areas shall be minimized, disturbed soil shall be managed, and construction site entrances shall be managed to prevent sediment tracking. Excessive sediment tracked onto public streets shall be removed immediately.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-1: Supplement contains: Local legislation current through Ord. 2024-12-A, passed 12-17-2024; and State legislation current through 2024 Illinois Legislative Service, Pamphlet #6).
Full Breakdown
158 of the county's Stormwater Management chapter requires construction sites to implement best management practices, or BMPs, that prevent sediment from leaving the site: disturbed areas must be minimized, disturbed soil actively managed, and site entrances controlled so vehicles do not track dirt onto public roads; any sediment that does reach a public street must be removed immediately, not left for the next rain. 156 requires waste and recycling containers wherever there is a risk that solid waste, industrial waste, or yard waste could be released, banning any uncontained waste that might blow or wash off site.
157 separately requires that ready-mixed concrete and vehicle or equipment washout from concrete work be contained on site for proper disposal rather than released. 159, the erosion-control duty does not end when construction wraps up: the property owner and any future owner remain responsible for continued compliance during later maintenance, reconstruction, or construction activity on the same site. 111 that gives a compliance deadline and a right to appeal within 15 days.
Violations & Fines
A notice of violation under § 152.111 sets a deadline to fix the erosion or sediment problem and can be appealed to the Zoning and Building Director within 15 days. Ignoring it exposes the responsible party to enforcement action under § 152.113, including a stop work order halting all further construction, and to a fine under § 152.999 of $250 to $1,500, with each day the violation continues counted as a separate offense.
Frequently Asked Questions
Who is responsible for erosion control on a Rock Island County construction site?
What happens if sediment gets tracked onto a public road?
Can the county stop work on my site for an erosion violation?
What is the fine for an erosion control violation?
Sources & Official References
Other rules in Rock Island County
Compare Rock Island County to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.