Key Facts

Core duty
Prevent erosion/sediment from leaving the site
Buffer requirement
5-ft green buffer or erosion control device
Grading permit fee
$25 (<1 acre) / $50 (≥1 acre)
No-permit penalty fee
$100 (<1 acre) / $200 (≥1 acre)
Commercial inspections
Initial, interim, and final required
Escalating fines
Up to $1,000/day by third offense

Summary

Lake Charles Code Sec. 21-234 requires developers and property owners to control erosion and sedimentation on construction sites so runoff does not cross onto neighboring property, rights-of-way, streets, or streams. The city can demand a separate erosion control plan, and inspectors enforce a set of minimum control measures under Section 21-234.1.

Developers and/or property owners shall use appropriate erosion and sedimentation control measures to ensure that erosion, or adverse conditions caused by erosion or sedimentation, is eliminated or held to an acceptable minimum and does not cross to an adjoining property, right-of-way, street, or stream. When deemed necessary, the public works engineers, zoning and development director, city manager, and /or the city council may require that a separate, detailed erosion and sedimentation control plan be submitted along with the site plan. Otherwise, control measures should be indicated on the site plan.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 20).

Full Breakdown

Section 21-234 of the Code of Ordinances requires developers and property owners to use appropriate erosion and sedimentation control measures so that erosion, or the adverse conditions it causes, is eliminated or held to an acceptable minimum and does not cross to an adjoining property, right-of-way, street, or stream. The public works engineer, the zoning and development director, the city manager, or the city council can require a separate, detailed erosion and sedimentation control plan submitted with the site plan; otherwise control measures need only be shown on the site plan itself.

All control measures must be field-approved by city staff, typically the public works inspector, and maintained by the developer for the life of the project. 1 spells out the minimum measures for projects under one acre: exposing the smallest practical area at a time, maintaining a five-foot green buffer along the perimeter (or installing an erosion control device if the buffer is absent), directing runoff to protected storm drains, seeding or mulching any area exposed more than three months, installing temporary furrows, terraces, or sediment basins, and installing a silt fence or hay bales where soil could wash onto a roadway.

A gravel construction entrance is required before any site work begins, and sediment tracked onto roadways or into drainage ditches must be removed by the end of each working day. 00 respectively and a stop-work notice is posted on site. Section 21-235 assigns inspection and enforcement to the public works engineer, the planning and zoning department, or their designees, requiring three inspections (initial, interim, final) for commercial sites where soil is disturbed, each scheduled at least 24 hours in advance.

Violations & Fines

A stop-work notice for missing or inadequate erosion controls counts as a first offense under Section 21-267's escalating fine schedule: a warning for the first offense, $500.00 per day for a second offense, and a possible stop-work order plus civil or criminal penalties of at least $1,000.00 per day for a third offense. Intentional or continued violation of the erosion control policy under Section 21-235(e) is also a civil offense punishable by a separately administered civil penalty, and any clearing or land-disturbing work found out of compliance can be halted at the direction of the public works engineer or the planning and zoning department until every provision is met.

Frequently Asked Questions

Does Lake Charles require an erosion control plan for construction?
Yes. Under Section 21-234, developers and property owners must use erosion and sediment control measures shown on the site plan, and the public works engineer, zoning and development director, city manager, or city council can require a separate, detailed erosion and sedimentation control plan for the project.
What erosion control measures does Lake Charles require on small sites?
Section 21-234.1 requires a minimum five-foot green buffer along the perimeter (or an erosion control device if there is no buffer), a gravel construction entrance before site work starts, silt fences or hay bales where soil could wash onto roads, and seeding or mulching of any area left exposed more than three months.
What happens if erosion controls fail inspection in Lake Charles?
The public works engineer or planning and zoning department can stop the work until compliance is met. Under Section 21-267, a first offense draws a warning, a second offense costs $500.00 per day, and a third offense can bring a stop-work order plus civil or criminal penalties of at least $1,000.00 per day.

Sources & Official References

Other rules in Lake Charles

All Lake Charles rules

Compare Lake Charles to another location·View the Louisiana environmental rules overview

Get notified when Erosion Control in Lake Charles, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.