Key Facts

Permit Trigger
50 cubic yards or 3 feet depth
Foundation Drainage
6 inches in 10 feet
Engineer
TX PE stamp required
Retaining Wall
Permit over 4 feet
Neighbor Impact
Zero adverse runoff

Summary

Laredo requires grading permits for excavations over 50 cubic yards or 3 feet depth. Drainage plans must show no adverse impact on neighbors. Positive drainage required away from foundations: minimum 6 inches in first 10 feet.

Sec. 232.003. SUBDIVISION REQUIREMENTS. By an order adopted and entered in the minutes of the commissioners court, and after a notice is published in a newspaper of general circulation in the county, the commissioners court may:(1) require a right-of-way on a street or road that functions as a main artery in a subdivision, of a width of not less than 50 feet or more than 100 feet;(2) require a right-of-way on any other street or road in a subdivision of not less than 40 feet or more than 70 feet;(3) require that the shoulder-to-shoulder width on collectors or main arteries within the right-of-way be not less than 32 feet or more than 56 feet, and that the shoulder-to-shoulder width on any other street or road be not less than 25 feet or more than 35 feet;(4) adopt, based on the

Source: Laredo EngineeringView official code

Full Breakdown

Laredo Engineering Department issues grading permits under Chapter 31 and the Land Development Code. Grading over 50 cubic yards of cut or fill, or any excavation over 3 feet deep, requires an engineered grading plan stamped by a Texas licensed professional engineer. Plans must show existing and proposed contours, drainage patterns, retaining wall locations, and erosion controls. The engineer must certify no adverse impact on upstream or downstream neighbors: diverting runoff onto adjacent property is a civil tort and code violation. New residential construction requires positive drainage: grade falls minimum 6 inches in the first 10 feet from foundations (IRC R401.3). Lots with slopes over 15 percent require geotechnical review. Retaining walls over 4 feet tall (measured from bottom of footing to top of wall) require engineered plans and building permits.

Violations & Fines

Unpermitted grading: stop work, 500-2,500 dollars. Runoff onto neighbor: civil liability plus abatement order. Wall over 4 feet unpermitted: tear-down risk.

Frequently Asked Questions

Do I need a permit to level my Laredo yard?
Minor grading under 50 cubic yards and 3 feet depth usually doesn't need a permit, but you still can't divert runoff to neighbors.
Who is liable if my new grading floods my neighbor?
You are. Texas courts apply the reasonable use rule: you cannot materially alter drainage to harm adjacent property.

Sources & Official References

Other rules in Laredo

All Laredo rules

Texas rules heatmap·Compare Laredo to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Laredo, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.