Lawrence, MA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Stormwater management permit from board of health
Trigger
Land disturbance over 1 acre, or 5,000 sq ft
Review timeline
60 days for a complete application
Erosion standards
Mass. Stormwater Handbook Standards 2, 4, 8, 9
Fee-in-lieu
Allowed when on-site controls are impractical
Appeal path
Superior Court within 60 days, M.G.L. c.249 §4

Summary

Any construction project in Lawrence that disturbs more than one acre, or 5,000 square feet in higher-pollutant or combined-sewer areas, must get a stormwater management permit from the board of health before breaking ground. Erosion and sediment control on site must follow Massachusetts Stormwater Handbook Standards 2, 4, 8, and 9 under City Code Chapter 20.03.

Unless exempt under section 20.03.050 below, all activities under the jurisdiction of this chapter shall be required to obtain a stormwater management permit from the board of health prior to beginning any site work. ... Criteria for erosion and sediment control and post-construction stormwater management, including stormwater performance standards, shall be in accordance with standards 2, 4, 8, and 9 of the Massachusetts Stormwater Handbook and any supplemental requirements as may be contained in the stormwater regulations under section 20.03.070 of this chapter.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 8).

Full Breakdown

03, adopted by Doc. 239/2014, effective March 17, 2015) requires a stormwater management permit from the board of health, acting as the city's stormwater authority, before any covered site work begins. The permit reaches any subdivision needing a definitive plan under the Subdivision Control Law and Title 16 of the Municipal Code, any land disturbance over one acre, smaller disturbances that are part of a common development plan eventually exceeding one acre, disturbances over 5,000 square feet for higher-pollutant land uses under Standard 5 of the Massachusetts Stormwater Handbook, and any disturbance over 5,000 square feet discharging to a combined sewer.

Even "Approval Not Required" lots meeting these tests still need a permit. 070. c. 40A, § 3, projects fully under a conservation commission order of conditions no less strict than this chapter, emergency municipal stormwater repairs, and routine maintenance of public ways. The board of health must act on a complete application within 60 days, may approve, deny, or condition a permit, may allow a fee-in-lieu payment to the water and sewer enterprise fund when on-site controls are impractical, and, after consulting the conservation commission and city engineer, may waive strict compliance in writing. c. 249, § 4.

Violations & Fines

The board of health enforces Chapter 20.03 directly, backed by civil and criminal remedies including injunctive relief, monetary damages, and litigation costs under Section 20.03.120. It may instead use the noncriminal disposition process under M.G.L. c. 40, § 21D, and each day a violation continues counts as a separate offense. Agents may enter a site to check compliance with an issued permit.

Frequently Asked Questions

Do I need a permit to build a house in Lawrence with erosion controls?
No. Section 20.03.050 exempts construction of a single-family or two-family dwelling from the stormwater management permit, along with routine landscaping maintenance and agricultural land use, but any commercial or larger residential project disturbing more than an acre still needs board of health sign-off before grading starts.
How long does Lawrence have to review a stormwater management permit?
The board of health's regulations must require a decision within 60 days of a complete application, per Section 20.03.070, unless an extension is granted. The board may approve, disapprove, or approve with conditions once it determines whether the chapter's requirements are met.
What standards govern erosion and sediment control on a Lawrence job site?
Section 20.03.090 requires builders to follow Standards 2, 4, 8, and 9 of the Massachusetts Stormwater Management Handbook for erosion and sediment control and post-construction stormwater management, plus any extra requirements the board of health adopts in its own stormwater regulations under Section 20.03.070.
Can I pay a fee instead of building an on-site erosion control system?
Yes, in limited cases. Section 20.03.100 lets the board of health accept a fee-in-lieu payment to the city's water and sewer enterprise fund when on-site controls are impractical, would create a negative environmental impact if built, and the fee serves the city's stormwater capital fund better.

Sources & Official References

Other rules in Lawrence

All Lawrence rules

Compare Lawrence to another location·View the Massachusetts environmental rules overview

Get notified when Erosion Control in Lawrence, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.