Lubbock County, TX Environmental Rules: Erosion Control (2026)
Key Facts
- Design standard
- Channels must resist scour from high velocities
- Scope
- Rule extends to roadside bar ditches
- Materials
- Erosion protection via concrete or rock retards
- Ditch specs
- Flat-ground ditches: 8-foot bottom, 9-inch max depth
- Bridges
- Designed for 25-year storm frequency
- Penalty
- Class B misdemeanor under § 2.2
Summary
Lubbock County requires drainage channels in new subdivisions to be shaped, graded, lined or protected against scour erosion from high water velocities, a standard that extends to the roadside bar ditches along county roads. Section 9.6 of the county's Subdivision Regulations sets the design and material requirements the Lubbock County Transportation Administration enforces.
Design of channels shall consider velocities and shall be shaped, graded, lined or protected to minimize or prevent scour erosion from excessive velocities. The requirement shall extend to roadside drainage ditches often called bar ditches. Concrete or rock retards shall be used where necessary and shall be constructed to meet Texas Department of Transportation Specifications or Lubbock County specifications.
Full Breakdown
6, Drainage Structures, requires that the design of drainage channels account for water velocity and be shaped, graded, lined or otherwise protected to minimize or prevent scour erosion from excessive velocities, and it expressly extends that requirement to the roadside drainage ditches commonly called bar ditches, not just engineered channels inside a subdivision. 6 calls for concrete or rock retards built to Texas Department of Transportation specifications or Lubbock County's own specifications. The same section requires open channels to follow one of three design methods, earthen, lined, or natural channels approved by the County Transportation Administration, and sets minimum storm runoff frequencies the erosion-control design must hold up against: twenty-five years for bridges, ten years for culverts under sixty inches, and two years for curb-and-gutter and storm sewer sections; residential streets must be designed to protect abutting private property through a twenty-five-year peak storm flood.
6 further specifies flat-bottom ditches with an eight-foot bottom width, a depth capped at nine inches, and cross slopes no steeper than 18 to 1, measures aimed at keeping flow velocities low enough to avoid scouring the channel. All drainage pipe used to meet these standards must be new material, and the Transportation Administration signs off on the final design before a plat is approved.
Violations & Fines
Section 2.2 of the Subdivision Regulations makes knowingly or intentionally violating any requirement in the regulations, including the § 9.6 channel and erosion-control design standards, a Class B misdemeanor. The Lubbock County Transportation Administration reviews and approves channel designs before final plat approval, and the County Criminal District Attorney's Office enforces the regulations.
Frequently Asked Questions
Does Lubbock County regulate erosion in roadside ditches, not just subdivision channels?
What materials does the county require for erosion protection?
What storm frequency must a subdivision's drainage design withstand?
Sources & Official References
Other rules in Lubbock County
Texas rules heatmap·Compare Lubbock County to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.