Skip to main content
CityRuleLookup

New Port Richey, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
New construction, building enlargements
1-2 family exemption
Unless a drainage problem is suspected
Plan preparer
Florida-licensed civil engineer
Approval needed
Written sign-off from city engineer

Summary

New Port Richey requires a state-licensed civil engineer's signed and sealed drainage plan, approved in writing by the city engineer, before the city issues a building permit for most new construction or building enlargements.

A drainage plan prepared, signed and sealed by a civil engineer licensed in the state shall be submitted to the building official prior to the issuance of a building permit for the construction or enlargement of any building or structure except a one-and two-family dwelling. For one-or two-family dwelling, if the building official has reason to believe that there is an existing or potential drainage problem, the building official shall require the submission of a signed and sealed drainage plan prior to the issuance of a building permit for such dwelling. When a drainage plan is required hereunder, no building permit shall be issued until the building official receives approval in writing of the drainage plan from the city engineer.

(Code 1964, § 6-5; Ord. No. 1426, § 7, 6-17-97)

Cross reference— Flood damage prevention, Ch. 9.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 68).

Full Breakdown

Under City Code Section 6-26, any building permit for constructing or enlarging a building or structure, other than a one- or two-family dwelling, requires a drainage plan prepared, signed and sealed by a Florida-licensed civil engineer, submitted to the building official and approved in writing by the city engineer. One- and two-family dwellings are exempt unless the building official believes an existing or potential drainage problem exists on the lot. A related rule, Section 6-28, requires fill placed more than six inches above natural grade to be mechanically compacted before pouring concrete floors.

Violations & Fines

No building permit issues without the required drainage plan and city engineer sign-off; proceeding without one violates the Section 6-20 permit rules and can draw a code enforcement citation.

Frequently Asked Questions

Does a new single-family home in New Port Richey need a drainage plan?
Not automatically: only if the building official has reason to believe there is an existing or potential drainage problem on the lot, per Section 6-26.
Who can prepare a drainage plan for New Port Richey?
Only a civil engineer licensed in Florida; the city engineer must approve the plan in writing before a building permit can be issued.

Sources & Official References

Other rules in New Port Richey

All New Port Richey rules

Florida rules heatmap·Compare New Port Richey to another location·View the Florida environmental rules overview

Get notified when Erosion Control in New Port Richey, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Pasco County handle erosion control.

Dade City, FL
Some Restrictions